Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
PDSD Engineering Division Pre-Construction SITE |
|
Not Ready |
|
| 08/11/2022 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Zac with spectrum builders at 444-9370. Provide address. Provide Stormwater controls as needed. Schedule inspections biweekly. Recessed landscaped areas shown. Pay attention to all Stormwater requirements shown on approved civil drawings. Accessible paths shall not exceed 2% cross slope. Trash enclosure structure, footings and slab require rebar inspections.. Site is less than 1 acre. |
| 07/27/2022 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Denied |
Entered by VVERA1 - . Denied. Contractor shall schedule a preconstruction meeting and provide contact information for inspection. |
| 04/28/2023 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
|
| 12/14/2022 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
N/A |