Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP21-0026
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | PDSD Engineering Division Pre-Construction SITE | Not Ready | ||
06/23/2022 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Denied | Entered by NGARCIA3 - Denied. Courtesy unscheduled inspection for Mark, project superintendent for the dairy queen building. Development package shows multiple buildings to be installed on this site. Please schedule inspections from your development package permit as required. Every two weeks at minimum and sooner as needed. Permit and plans indicate the requirement for an SWPPP permit. Post your address. Trash enclosure shall be installed per City of Tucson Department of transportation detail 60 1. Temporary fencing has been installed around portion of the site designated as phase 1. |
04/01/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
05/12/2023 | PDSD Engineering Division Pre-Construction SITE | Partial Pass | Phase 1 completed |