Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/11/2022 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by VVERA1 - Not ready. Complete all work as shown on approved construction drawings. Install grouted riprap as shown. Insure basins are sized as shown on approved construction drawings. Provide engineer approval from project engineer of record for work constructed without inspection.
Courtesy inspection. No contact information provided. Superintendent not on site for inspection.
|
| 10/27/2022 |
ENGR Engineering Final
|
|
Partial Pass |
Partially approved. |
| 10/26/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/26/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
Not ready 1019 W. PRINCE RD |
| 10/26/2022 |
ENGR Engineering Final
|
|
Complete (Recurring) |
|