Permit: DP21-0003

Parcel: 11103064G

Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
11/09/2023 ENGR Grading Final Not Ready
11/09/2023 ENGR Grading Final Not Ready
11/09/2023 ENGR Grading Final Not Ready on-site meeting with Dane. Work completed todate without development package inspections.
Provide documentation from project engineer, confirming trash enclosure was constructed per transportation detail 801. Correct rip wrap and water harvesting areas. Complete remaining work. Terminate swpPP if applicable.
11/09/2023 ENGR Grading Final Not Ready on-site meeting with Dane. Work completed todate without development package inspections.
Provide documentation from project engineer, confirming trash enclosure was constructed per transportation detail 801. Correct rip wrap and water harvesting areas. Complete remaining work. Terminate swpPP if applicable.
11/29/2023 ENGR Grading Final Not Ready
11/29/2023 ENGR Grading Final Partial Pass
11/29/2023 ENGR Grading Final Partial Pass
11/29/2023 ENGR Grading Final Passed Dane @ 331-6433
12/06/2023 ENGR Grading Final Passed
12/06/2023 ENGR Grading Final Passed
12/06/2023 ENGR Grading Final Passed