Permit: DP21-0003

Parcel: 11103064G

Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final Not Ready
10/27/2022 ENGR Engineering Final Not Ready
11/09/2023 ENGR Engineering Final Not Ready on-site meeting with Dane. Work completed todate without development package inspections.
Provide documentation from project engineer, confirming trash enclosure was constructed per transportation detail 801. Correct rip wrap and water harvesting areas. Complete remaining work. Terminate swpPP if applicable.
11/09/2023 ENGR Engineering Final Partial Pass on-site meeting with Dane. Work completed todate without development package inspections.
Provide documentation from project engineer, confirming trash enclosure was constructed per transportation detail 801. Correct rip wrap and water harvesting areas. Complete remaining work. Terminate swpPP if applicable.
11/29/2023 ENGR Engineering Final Not Ready Dane. Riprap has not been installed per plan specifications. Bollards have not been installed per plan.
11/29/2023 ENGR Engineering Final Not Ready not built per plan specifications. Complete work and provide documentation for any changes.
12/07/2023 ENGR Engineering Final Not Ready redoing stormwater collection area on northwest portion of site
12/07/2023 ENGR Engineering Final Not Ready redoing stormwater collection area on northwest portion of site. ADA parking spot needs to moved one space north so the hashed area is 0n the right side of the ADA parking spot. move ADA sign to the wall of building (5 foot height) at the new ADA parking spot. east west hashed walkway in parking area not present must added.
12/08/2023 ENGR Engineering Final Passed
12/08/2023 ENGR Engineering Final Passed Dane meeting 1pm