Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP20-0274
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 02/01/2023 | ENGR Engineering Final | Partial Pass | Engineering has no issues, preventing a certificate of occupancy for the Dunkin’ Donuts building | |
| 05/12/2023 | ENGR Engineering Final | Partial Pass | Terminate sewer, clean out located in bottom of Stormwater basin. Install curb stop in accessible space to prevent vehicle impact with accessible sign pole. | |
| 05/12/2023 | ENGR Engineering Final | Partial Pass | Terminate sewer, clean out located in bottom of Stormwater basin. Install curb stop in accessible space to prevent vehicle impact with accessible sign pole. | |
| 05/16/2023 | ENGR Engineering Final | Passed | ||
| 05/16/2023 | ENGR Engineering Final | Passed |