Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP20-0268
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
10/27/2022 | ENGR Engineering Final | Not Ready | ||
01/20/2023 | ENGR Engineering Final | Not Ready | Complete all work on this site prior to calling this in for a reinspection | |
01/20/2023 | ENGR Engineering Final | Not Ready | Complete everything is shown on the approved plans prior for calling this inspection in for a final release. Currently what should be called in every two weeks is this STORMWATER follow up inspection to ensure that everything is covered as required by Arizona Department of Environment Quality. | |
05/01/2023 | ENGR Engineering Final | Complete (Recurring) | I will still work need to be done on site | |
05/01/2023 | ENGR Engineering Final | Complete (Recurring) | Where is basin still under construction | |
09/29/2023 | ENGR Engineering Final | Not Ready | Complete all the work is shown on the approved plans prior to calling in this inspection for a final | |
09/29/2023 | ENGR Engineering Final | Not Ready | Complete all the work on this site as shown on the approved plans prior to calling in this inspection for a final |