Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP20-0226
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/02/2022 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
08/02/2022 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
02/04/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - CONTINUED, CREWS WORKING ON CURB PLACEMENT |
07/02/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - CONTINUED MINOR GRADING OF THE SITE AND FORM PLACEMENT FOR THE FLOOR SLAB |
06/18/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - ROUGH GRADING WORK HAS BEEN COMPLETED, FOUNDATIONS HAVE BEEN POURED FOR THE BUILDING, CREWS ARE WORKING ON THE INTERIOR PORTION OF THE BUILDING FORMING AND UTILITIES AT VARIOUS LOCATIONS. |
08/02/2022 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
03/02/2022 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VVERA1 - CN/ FORMING FOR THE INLET FOOTER AND THE CATCH BASIN WALLS AND FLOOR GOOD . |
12/15/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN /LIGHT POLE FOUNDATIONS GOOD AT IS TIME |
11/10/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VVERA1 - CN THE FLOOR FOR TRASH BIN /THE WALLS WERE NOT INSPECT .NEED THE ENGINEER OF RECORD TO APPROVED THE WALLS . |
08/02/2022 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
06/18/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CONTINUED AT THIS TIME WORK IS IN PRPESS T THI TIME SEE NOTES IN GRADING INTERMEDIATE |
05/10/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CONTINUED AT THIS TIME. THE CONTRACTOR HAS CONSTRUCTED THE TENT NEAR THIS SITE FOR THE GROUND BREAKING CEREMONY THAT WILL BE HELD TOMORROW EVENING. THEY HAVE ALSO WORKED ON THE CLEARING THE EXISTING VEGETATION FROM A PORTION OF THE SITE FOR THE CEREMONIES. I HAVE REMINDED THEM THAT THERE ARE SOME ISSUES WITH THE REQUIRED TREES AND BARREL CACTUS FOR THE FINAL CLOSURE OF THE SITE. |