Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP20-0226
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/02/2022 | ENGR Engineering Final | DROBERTS | Approved | Entered by DROBERT5 - |
04/29/2022 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by VVERA1 - IS NOT READY AT THIS TIME, LANDSCAPE CREWS WORKING ON IRRIGATION LINE INSTALLATIONS. THE FOLLOWING AREAS WERE NOTED AS NEEDING ATTENTION: 1) ADVISED THE CONTRACTOR THAT THE ADA PARKING SPACES AND ACCESS AISLES WERE NON-COMPLIANT FOR GRADES, AREAS EXCEEDING 2% WITHIN THE DESIGNATED SPACES. 2) THE SIDEWALK RAMPS LOCATED ALONG THE SOUTH SIDE OF THE BUILDING EXCEED 5% IN THE RUNNING SLOPE AND WILL REQUIRE HANDRAILS ON BOTH SIDES OF THE AFFECTED SIDEWALKS/RAMPS(3). 3) ALL CRACKS IN THE SIDEWALKS FOR THIS SITE WILL BE CHECKED TO ENSURE THST THEY HAVE BEEN REPLACED AS REQUIRED. I HAVE ADVISED THE CONTRACTOR THAT EVERY CRACK WILL BE CHECKED FOR MOVEMENT. ALSO ANY PANEL WITH MORE THAN ONE CRACK IN IT WILL NEED TO BE REMOVED AND REPLACED. 4) ADJACENT TO THE TRASH ENCLOSURE THE CONTRACTOR ADDED AN ADDITIONAL WATER HARVESTING BASIN. I HAVE ASKED FO THIS TO BE PUT ON THE APPROVED PLANS AS A REVISION PRIOR TO CLOSING THIS PROJECT OUT. THIS SITE WILL BE RE-INSPECTED PRIOR TO THE ISSUANCE OF THE CERTIFICATE OF OCCUPANCY. |
04/07/2022 | ENGR Engineering Final | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN CONTRACTOR NOT ON SITE NEED TO RESCHEDULE. |
08/02/2022 | ENGR Engineering Final | DROBERTS | Approved | Entered by DROBERT5 - |
05/11/2022 | ENGR Engineering Final | MHERNANDEZ | Continued | Entered by VVERA1 - CN /NEED TO POUR SOME CONCRETE IN THE FRONT OF THE BUILDING AND IN THE BACK TOO .. |