Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/03/2023 | ENGR Grading Final | Not Ready | Desert survivors nursery DP from 2020 looks like all tree inspections under the DP permit were never called in during project. | |
| 10/25/2023 | ENGR Grading Final | Not Ready | Handicap, walkway, and bicycle designated areas need further verification. Will review with Dave Robert’s. |
|
| 10/25/2023 | ENGR Grading Final | Not Ready | Handicap, walkway, and bicycle designated areas need further verification. Will review with Dave Robert’s. |
|
| 10/25/2023 | ENGR Grading Final | Not Ready | Handicap, walkway, and bicycle designated areas need further verification. Will review with Dave Robert’s. |
|
| 10/25/2023 | ENGR Grading Final | Not Ready | Handicap, walkway, and bicycle designated areas need further verification. Will review with Dave Robert’s. |