Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP20-0209
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/10/2021 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Approved | Entered by VLEON1 - Approved. Mike with Epstein at 891-1158. Campbell and Broadway Starbucks site. Steve shell. Water harvesting specified. No underground storm drain piping. One trash enclosure, please call for inspection when ready to start. Track out protection and other stormwater protections. Estimated two month project. |
02/09/2021 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Partial Approval | Entered by VLEON1 - Partially approved. Courtesy unscheduled inspection,Mike with Epstein construction. 891-1158. Steve shell architect. Starbucks site to break ground this week. Demolition, temporary fence installation. Please schedule inspections from development package permit. |