Permit: DP20-0209

Parcel: 12409156B


Addresses:

1821 E BROADWAY BL


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP20-0209

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
05/19/2021 ENGR Grading Final BBENEDON Approved Entered by VLEON1 -
05/18/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Final grading. Remove construction degrees in landscaped areas prior to planting
05/13/2021 ENGR Grading Final BBENEDON Partial Approval Entered by VLEON1 - Partially approved. Paving in progress
04/29/2021 ENGR Grading Final BBENEDON Partial Approval Entered by VLEON1 - Partially approved. Final grading in Progress . Materials still need to be removed at detention location.Walked the site with Mike. No issues at this time.
04/28/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Mike with Epstein. Please consult with civil engineer regarding trash enclosure total with discrepancy.
04/13/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Mike with Epstein. Please consult with civil engineer regarding trash enclosure apron discrepancy at Alley. Inspector will except installation as shown
03/26/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Sidewalk and curb installation in progress. Mike with Epstein. No issues or concerns
03/24/2021 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Courtesy inspection for Mike. Install Ballard’s as specified.
03/18/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Mike with Epstein installing curbs as shown.
02/12/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - CONTINUE FOR 1650 E 10TH ST - Continued. Demo of Psi in progress. Temporary fencing installed. Material and debris stock pile west of building.
02/12/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Demo of Psi in progress. Temporary fencing installed. Material and debris stock pile west of building.
06/25/2021 ENGR Grading Final BBENEDON Approved Entered by VLEON1 -
07/30/2021 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
05/26/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. Rough grading completed. TI contractor on site
01/07/2021 ENGR Grading Final DROBERTS Continued Entered by VLEON1 - GRADING-CHECK FOR ACTIVITY IS CONTINUED AT THIS TIME. THE EXISTING SITE HAS BEEN CLOSED DUE TO THE NEW CONSTRUCTION ON BROADWAY. NO WORK HAS BEEN DONE TO THIS SITE AT THIS TIME.
07/30/2021 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
05/26/2021 ENGR Grading Final BBENEDON Partial Approval Entered by VLEON1 - Partially approved. Irrigation has been installed. Remove rocks in degree prior to plant and tree installation
04/14/2021 ENGR Grading Final BBENEDON Approved Entered by VLEON1 -
04/07/2021 ENGR Grading Final BBENEDON Partial Approval Entered by VLEON1 - Partially approved. Trash enclosure pre-grout with bond beam. Mike with Epstein
04/05/2021 ENGR Grading Final DROBERTS Partial Approval Entered by RSALDAT1 - PARTIAL AT THIS TIME, OKAY TO GROUT THE LOWER 4 FEET OF THE TRASH ENCLOSURE, AND TO START CONSTRUCTING THE SMALL WALLS ON THIS SITE.
04/02/2021 ENGR Grading Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Pre-grout. Provide vertical number four rebar 32 inches on center and ladder wire every other course. Mike from Epstein.
03/31/2021 ENGR Grading Final DROBERTS Continued Entered by RSALDAT1 - 1821 CONTINUED FOR THE POURING OF THE TRASH ENCLOSURE, MINOR ADJUSTMENT TO THE STRUCTURE ADD BARS IN THE CORNERS, ALSO LOOKED AT THE SMALL WALL SOUTH AND EAST OF THE EXISTING STRUCTURE.