Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
Permit Number - DP20-0189
Inspection Description - SITE - Stormwater Setup and Controls
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | SITE - Stormwater Setup and Controls | Not Ready | ||
06/30/2022 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Partial Approval | Entered by NGARCIA3 - PARTIAL 2110 E AJO WY |
06/30/2022 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Partial Approval | Entered by NGARCIA3 - PARTIAL 2100 E AJO WY |
07/08/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by RSALDAT1 - CN |
06/22/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE FOR 2110 W AJO WAY |
06/22/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE FOR 2100 W AJO WAY |
06/04/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE FOR 2110 E AJO WAY |
06/04/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE FOR 2100 E AJO WAY |
05/18/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE FOR 2110 E AJO WAY |
05/18/2021 | SITE - Stormwater Setup and Controls | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE FOR 2100 E AJO WAY |
07/07/2023 | SITE - Stormwater Setup and Controls | Not Ready | Complete all work as shown on the approved plans for this site, this will include but not limited too all common areas, all landscaping, all water harvesting basins will need to be completed fully landscaped fully as shown on the tenant in flat, and anything else that is required to support the site. For all areas that have been disturbed that have not been asked constructed upon it will be required that either hydroseeding of the disturb soils or placement of decompose granite will be required prior to the completion of this site. This is not to be considered a fall or final punch list for this project at this time because too many numerous items have been left incomplete. A full future inspection on this site will be required. Once all work has been completed as shown on the approved plans prior to a full release of this site and it’s assurances. | |
07/10/2023 | SITE - Stormwater Setup and Controls | Not Ready | NW inlet structure for the east basin (E) has not been constructed per the approved plans and does not drain into basin (E). | |
09/14/2023 | SITE - Stormwater Setup and Controls | Passed |