Permit: DP20-0189

Parcel: 132191450


Addresses:

2100 E AJO WY


Inspection Status: Not Ready

Inspection History: SITE - Stormwater Setup and Controls

Permit Number - DP20-0189

Inspection Description - SITE - Stormwater Setup and Controls

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/26/2022 SITE - Stormwater Setup and Controls Not Ready
06/30/2022 SITE - Stormwater Setup and Controls MHERNANDEZ Partial Approval Entered by NGARCIA3 - PARTIAL 2110 E AJO WY
06/30/2022 SITE - Stormwater Setup and Controls MHERNANDEZ Partial Approval Entered by NGARCIA3 - PARTIAL 2100 E AJO WY
07/08/2021 SITE - Stormwater Setup and Controls MHERNANDEZ Continued Entered by RSALDAT1 - CN
06/22/2021 SITE - Stormwater Setup and Controls MHERNANDEZ Continued Entered by VLEON1 - CONTINUE FOR 2110 W AJO WAY
06/22/2021 SITE - Stormwater Setup and Controls MHERNANDEZ Continued Entered by VLEON1 - CONTINUE FOR 2100 W AJO WAY
06/04/2021 SITE - Stormwater Setup and Controls MHERNANDEZ Continued Entered by VLEON1 - CONTINUE FOR 2110 E AJO WAY
06/04/2021 SITE - Stormwater Setup and Controls MHERNANDEZ Continued Entered by VLEON1 - CONTINUE FOR 2100 E AJO WAY
05/18/2021 SITE - Stormwater Setup and Controls MHERNANDEZ Continued Entered by VLEON1 - CONTINUE FOR 2110 E AJO WAY
05/18/2021 SITE - Stormwater Setup and Controls MHERNANDEZ Continued Entered by VLEON1 - CONTINUE FOR 2100 E AJO WAY
07/07/2023 SITE - Stormwater Setup and Controls Not Ready Complete all work as shown on the approved plans for this site, this will include but not limited too all common areas, all landscaping, all water harvesting basins will need to be completed fully landscaped fully as shown on the tenant in flat, and anything else that is required to support the site. For all areas that have been disturbed that have not been asked constructed upon it will be required that either hydroseeding of the disturb soils or placement of decompose granite will be required prior to the completion of this site. This is not to be considered a fall or final punch list for this project at this time because too many numerous items have been left incomplete. A full future inspection on this site will be required. Once all work has been completed as shown on the approved plans prior to a full release of this site and it’s assurances.
07/10/2023 SITE - Stormwater Setup and Controls Not Ready NW inlet structure for the east basin (E) has not been constructed per the approved plans and does not drain into basin (E).
09/14/2023 SITE - Stormwater Setup and Controls Passed