Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - Landscaping
Permit Number - DP20-0189
Inspection Description - PDSD Site/Engineering Division - Landscaping
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
10/27/2022 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
06/30/2022 | PDSD Site/Engineering Division - Landscaping | MHERNANDEZ | Partial Approval | Entered by NGARCIA3 - PARTIAL 2110 E AJO WY |
06/30/2022 | PDSD Site/Engineering Division - Landscaping | MHERNANDEZ | Partial Approval | Entered by NGARCIA3 - PARTIAL 2100 E AJO WY |
06/30/2022 | PDSD Site/Engineering Division - Landscaping | MHERNANDEZ | Partial Approval | Entered by NGARCIA3 - PARTIAL 2110 E AJO WY |
06/30/2022 | PDSD Site/Engineering Division - Landscaping | MHERNANDEZ | Partial Approval | Entered by NGARCIA3 - PARTIAL 2100 E AJO WY |
06/07/2022 | PDSD Site/Engineering Division - Landscaping | DROBERTS | Not ready for Inspection | Entered by NGARCIA3 - IS NOT READY AT THIS TIME,COMPLETE ALL WORK FOR ALL PHASES PRIOR TO RESCHEDULING THIS INSPECTION. 2100 E AJO WY |
06/07/2022 | PDSD Site/Engineering Division - Landscaping | DROBERTS | Not ready for Inspection | Entered by NGARCIA3 - IS NOT READY AT THIS TIME,COMPLETE ALL WORK FOR ALL PHASES PRIOR TO RESCHEDULING THIS INSPECTION. 2110 E AJO WY |
07/07/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | Complete all work as shown on the approved plans for this site, this will include but not limited too all common areas, all landscaping, all water harvesting basins will need to be completed fully landscaped fully as shown on the tenant in flat, and anything else that is required to support the site. For all areas that have been disturbed that have not been asked constructed upon it will be required that either hydroseeding of the disturb soils or placement of decompose granite will be required prior to the completion of this site. This is not to be considered a fall or final punch list for this project at this time because too many numerous items have been left incomplete. A full future inspection on this site will be required. Once all work has been completed as shown on the approved plans prior to a full release of this site and it’s assurances. | |
07/17/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | Complete all work as shown on the approved plans for this site prior to requesting this final inspection. This will include all portions of the site, the remaining four pads and all common areas. | |
09/14/2023 | PDSD Site/Engineering Division - Landscaping | Passed | Landscaping for this site has only been completed in the following areas: 1) DP20-0189 AJO MARKET PLACE page 14 of 23 the Common Area Basin E and the Common Area north of the Raising Cane’s property boundaries from the western driveway entrance to the western boundary of Raising Cane’s property. 2) DP21-0029 RAISING CANE’S page 15 to 26 within the property boundaries of Raising Cane’s as noted on the Approved plans for this site. 3) DP20-0204 RUDY’S pages 9 to 13 within the property boundaries as noted on the Approved plans for this site. No other Landscaping has been completed on this site at this time and will need to be Completed and Approved on the Phase 2 portion of this Project before that Development Package/Plan can be fully Approved and Finaled |
|
09/14/2023 | PDSD Site/Engineering Division - Landscaping | Passed | Landscaping for this site has only been completed in the following areas: 1) DP20-0189 AJO MARKET PLACE page 14 of 23 the Common Area Basin E and the Common Area north of the Raising Cane’s property boundaries from the western driveway entrance to the western boundary of Raising Cane’s property. 2) DP21-0029 RAISING CANE’S page 15 to 26 within the property boundaries of Raising Cane’s as noted on the Approved plans for this site. 3) DP20-0204 RUDY’S pages 9 to 13 within the property boundaries as noted on the Approved plans for this site. No other Landscaping has been completed on this site at this time and will need to be Completed and Approved on the Phase 2 portion of this Project before that Development Package/Plan can be fully Approved and Finaled |