Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
SITE - Stormwater Setup and Controls |
|
Not Ready |
|
| 07/28/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Track out protection at North entrance.
520 N Houghton Rd, |
| 06/08/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by VVERA1 - Continued, unscheduled courtesy inspection. correction required. Track out noted, Track out protection needs corrected, schedule inspections biweekly as previously requested |
| 01/28/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Partial Approval |
Entered by VVERA1 - Partially approved. Track out rock added. Waddle added. |
| 11/05/2021 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Partially approved. Track out protection. Provide additional stormwater protection where required. |
| 02/16/2024 |
SITE - Stormwater Setup and Controls |
|
Partial Pass |
correct and install Stormwater controls as needed. Maintain concrete containment. Schedule inspections biweekly as previously requested. |
| 05/29/2024 |
SITE - Stormwater Setup and Controls |
|
Not Ready |
provide concrete containment |
| 06/02/2023 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
|
| 07/20/2023 |
SITE - Stormwater Setup and Controls |
|
Partial Pass |
|
| 10/26/2023 |
SITE - Stormwater Setup and Controls |
|
Not Ready |
grading complete, blocks 1& 2 , common areas not ready. stormwater controls in place. |
| 12/01/2023 |
SITE - Stormwater Setup and Controls |
|
Partial Pass |
|