Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP20-0179
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/07/2022 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Asphalt at front entrance |
09/14/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - Continued. Curbs at front entrance. Courtesy unscheduled inspection. |
08/12/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Site utilities |
07/28/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Utilities and Grading 520 N Houghton Rd, |
02/24/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - Continued. Sewer utility work in progress western portion of site |
02/17/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - Continued. Track out on Houghton Road. Material importing and utility work in progress |
02/03/2022 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by VVERA1 - Partially approved. Lots of been staked and graded |
01/28/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - Continued. Sewer utility work preparation’s. Pad buildup Southwestern portion completed. |
01/04/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Grading activities. |
11/19/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - Continued. Conversation with Clint with borderland at 603-9889. Watering pond installed. Grading operations to restart on Monday. There have been no changes or deviations from the approved drawings and no discrepancies noted at this time. |
11/19/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - Continued. Conversation with Clint with borderland at 603-9889. Watering pond installed. Grading operations to restart on Monday. There have been no changes or deviations from the approved drawings and no discrepancies noted at this time. |
10/01/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. On-site inspection with Dave Roberts. Grading lines have been established with less than the required sat back to apparently allow for landscaped common area between subdivisions. There appears to be no discrepancies at this time. Once property boundaries have been identified and 90 foot setback can be confirmed. Dave will contact Borderland to ensure compliance with approved drawings 520 N Houghton Rd |
02/16/2024 | ENGR Grading Final | Partial Pass | Paving and common area walkways | |
05/29/2024 | ENGR Grading Final | Partial Pass | Barrier fencing, basins | |
05/29/2024 | ENGR Grading Final | Passed | ||
06/02/2023 | ENGR Grading Final | Complete (Recurring) | ||
07/20/2023 | ENGR Grading Final | Partial Pass | ||
10/26/2023 | ENGR Grading Final | Passed | ||
10/26/2023 | ENGR Grading Final | Passed |