Permit: DP20-0179

Parcel: 133572270


Addresses:

10407 E BROADWAY BL


Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Permit Number - DP20-0179

Inspection Description - ENGR Grading Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/07/2022 ENGR Grading Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Asphalt at front entrance
09/14/2022 ENGR Grading Final BBENEDON Continued Entered by VVERA1 - Continued. Curbs at front entrance. Courtesy unscheduled inspection.
08/12/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Site utilities
07/28/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Utilities and Grading 520 N Houghton Rd,
02/24/2022 ENGR Grading Final BBENEDON Continued Entered by VVERA1 - Continued. Sewer utility work in progress western portion of site
02/17/2022 ENGR Grading Final BBENEDON Continued Entered by VVERA1 - Continued. Track out on Houghton Road. Material importing and utility work in progress
02/03/2022 ENGR Grading Final BBENEDON Partial Approval Entered by VVERA1 - Partially approved. Lots of been staked and graded
01/28/2022 ENGR Grading Final BBENEDON Continued Entered by VVERA1 - Continued. Sewer utility work preparation’s. Pad buildup Southwestern portion completed.
01/04/2022 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Grading activities.
11/19/2021 ENGR Grading Final BBENEDON Continued Entered by VVERA1 - Continued. Conversation with Clint with borderland at 603-9889. Watering pond installed. Grading operations to restart on Monday. There have been no changes or deviations from the approved drawings and no discrepancies noted at this time.
11/19/2021 ENGR Grading Final BBENEDON Continued Entered by VVERA1 - Continued. Conversation with Clint with borderland at 603-9889. Watering pond installed. Grading operations to restart on Monday. There have been no changes or deviations from the approved drawings and no discrepancies noted at this time.
10/01/2021 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. On-site inspection with Dave Roberts. Grading lines have been established with less than the required sat back to apparently allow for landscaped common area between subdivisions. There appears to be no discrepancies at this time. Once property boundaries have been identified and 90 foot setback can be confirmed. Dave will contact Borderland to ensure compliance with approved drawings 520 N Houghton Rd
02/16/2024 ENGR Grading Final Partial Pass Paving and common area walkways
05/29/2024 ENGR Grading Final Partial Pass Barrier fencing, basins
05/29/2024 ENGR Grading Final Passed
06/02/2023 ENGR Grading Final Complete (Recurring)
07/20/2023 ENGR Grading Final Partial Pass
10/26/2023 ENGR Grading Final Passed
10/26/2023 ENGR Grading Final Passed