Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP20-0167
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/14/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by NGARCIA3 - IS CONTINUED, MOST OF THE SITE WORK IS BEING WATCHED BY TDOT DUE TO THE PUBLIC ROADWAYS 6890 E CAMINO BOLEADORAS |
10/14/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by NGARCIA3 - IS CONTINUED, MOST OF THE SITE WORK IS BEING WATCHED BY TDOT, HOUSES ARE BEING CONSTRUCTED AT THIS TIME ON THIS SITE. 6801 E BENSON HY |
10/14/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by NGARCIA3 - IS CONTINUED, MOST OF THE SITE WORK IS BEING WATCHED BY TDOT, HOUSES ARE BEING CONSTRUCTED AT THIS TIME ON THIS SITE. 6601 E BENSON HY |
09/30/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - CONTINUED AT THIS TIME, MOST OF THE WORK ON THIS SITE IS VERTICAL FOR THE INDIVIDUAL LOTS |
09/30/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - CONTINUED AT THIS TIME, MOST OF THE WORK ON THIS SITE IS VERTICAL FOR THE INDIVIDUAL LOTS |
09/30/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - CONTINUED AT THIS TIME, MOST OF THE WORK ON THIS SITE IS VERTICAL FOR THE INDIVIDUAL LOTS |
09/16/2022 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by NGARCIA3 - PARTIAL, CREWS WORKING ON GRADING AND UTILITY WORK 6801 E BENSON HY |
09/16/2022 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by NGARCIA3 - IS PARTIAL, CREWS WORKING ON GRADING AND UTILITY WORK 6601 E BENSON HY |
08/19/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by VVERA1 - CONTINUE ON WORKING ON THE INSTALLATION OF UTILITIES AT VARIOS LOCATIONS THROUGHOUT THE SITE |
08/05/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - 6890 CONTINUED, CREWS ARE WORKING ON PREPARE CURB AND ROADWAY GRADES FOR FUTURE CONSTRUCTION. |
08/05/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - CONTINUED, CREWS ARE WORKING ON PREPARE CURB AND ROADWAY GRADES FOR FUTURE CONSTRUCTION. |
08/05/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - CONTINUED, CREWS ARE WORKING ON PREPARE CURB AND ROADWAY GRADES FOR FUTURE CONSTRUCTION. |
05/13/2022 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by VVERA1 - IS PARTIAL, CREWS WORKING ON NEEDED SITE WORK AS NEEDED FOR A FULL C OF O. |
05/13/2022 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by NGARCIA3 - PARTIAL, CREWS WORKING ON NEEDED SITE WORK AS NEEDED FOR A FULL C OF O. 6801 E BENSON HY |
05/13/2022 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by NGARCIA3 - PARTIAL, CREWS WORKING ON NEEDED SITE WORK AS NEEDED FOR A FULL C OF O. 6601 E BENSON HY |
04/01/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by VVERA1 - IS CONTINUED, CONTRACTOR WORKING ON FINE GRADING PAD ELEVATIONS, AND INSTALLATION OF UTILITIES. |
01/21/2022 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN /NO CONCERNS AT IS 6801 E BENSON HY |
01/21/2022 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN/ NO CHANGE ON SITE AS OF TODAY 6890 E CAMINO BOLEADORAS |
01/21/2022 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN/ NO CHANGE ON SITE AS OF TODAY AND NO CONCERNS AT IS TIME. 6601 E BENSON HY |
06/25/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - CONTINUED, CREWS CONTINUE TO WORK ON GRADING THE PADS AND THEIR OUTER SLOPES, INSTALLING PIPES AND UTILITIES AT VARIOUS LOCATIONS, FINISH GRADING AND COMPACTING SOME OF THE ROADWAYS AS NEEDED ONCE THE UTILITIES ARE COMPLETED, AND SPREADING WATER AROUND THE SITE TOO ENSURE THAT CONSTRUCTION DUST IS AS MINIMAL AS POSSIBLE. |
06/25/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CONTINUED, CREWS CONTINUE TO WORK ON GRADING THE PADS AND THEIR OUTER SLOPES, INSTALLING PIPES AND UTILITIES AT VARIOUS LOCATIONS, FINISH GRADING AND COMPACTING SOME OF THE ROADWAYS AS NEEDED ONCE THE UTILITIES ARE COMPLETED, AND SPREADING WATER AROUND THE SITE TOO ENSURE THAT CONSTRUCTION DUST IS AS MINIMAL AS POSSIBLE. |
06/25/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CONTINUED, CREWS CONTINUE TO WORK ON GRADING THE PADS AND THEIR OUTER SLOPES, INSTALLING PIPES AND UTILITIES AT VARIOUS LOCATIONS, FINISH GRADING AND COMPACTING SOME OF THE ROADWAYS AS NEEDED ONCE THE UTILITIES ARE COMPLETED, AND SPREADING WATER AROUND THE SITE TOO ENSURE THAT CONSTRUCTION DUST IS AS MINIMAL AS POSSIBLE. |
05/14/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - 6890 CONTINUED. GRADING SITE FOR FUTURE PADS, ROADWAY SUBGRADE, AND FUTURE UTILITY INSTALATIONS. |
05/14/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - 6601 CONTINUED. GRADING SITE FOR FUTURE PADS, ROADWAY SUBGRADE, AND FUTURE UTILITY INSTALATIONS. |
05/14/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - CONTINUED. GRADING SITE FOR FUTURE PADS, ROADWAY SUBGRADE, AND FUTURE UTILITY INSTALATIONS. |
04/16/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - CONTINUED, INITIAL GRADING AT THIS TIME |
03/04/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CONTINUED 6809 E CAMINO BOLEADORAS AT THIS TIME. CLEARING OF THE GRADE FOR VEGETATION IS BEING DONE BY THE CONTRACTOR. PILES OF OLD MATERIAL AND VEGETATION ARE BEING CREATED, THESE WILL EITHER BE REMOVED OR MULCHED AT A LATER DATE. |
03/04/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CONTINUED FOR 6601 E BENSON HWY AT THIS TIME. CLEARING OF THE GRADE FOR VEGETATION IS BEING DONE BY THE CONTRACTOR. PILES OF OLD MATERIAL AND VEGETATION ARE BEING CREATED, THESE WILL EITHER BE REMOVED OR MULCHED AT A LATER DATE. |
01/19/2023 | ENGR Grading Final | Complete (Recurring) | Most of those lots are still under construction | |
01/19/2023 | ENGR Grading Final | Complete (Recurring) | Most of those lots are still under construction | |
01/19/2023 | ENGR Grading Final | Complete (Recurring) | Most of those lots are still under construction | |
01/20/2023 | ENGR Grading Final | Not Ready | Complete all work on this site according to the approved plans prior to calling in for a final inspection | |
05/01/2023 | ENGR Grading Final | Complete (Recurring) | ||
05/01/2023 | ENGR Grading Final | Complete (Recurring) | ||
05/03/2023 | ENGR Grading Final | Complete (Recurring) | Lots are still under construction | |
05/07/2024 | ENGR Grading Final | Not Ready | COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS PRIOR TO SCHEDULING THIS INSPECTION | |
05/07/2024 | ENGR Grading Final | Not Ready | COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS PRIOR TO SCHEDULING THIS INSPECTION | |
09/29/2023 | ENGR Grading Final | Not Ready | Complete all the work on this site as shown on the approved plans prior to calling in this inspection for a final | |
09/29/2023 | ENGR Grading Final | Not Ready | Complete all the work on this site as shown on the approved plans prior to calling in this inspection for a final | |
09/29/2023 | ENGR Grading Final | Not Ready | Complete all work on this site prior to calling this Inspection, additional request for this Inspection may result in additional Charges be added for Re-Inspection of a Permit that is not ready. The Inspection that should be scheduled is the Stormwater Follow-up every 2 weeks. Contact David Roberts at (520) 349-7643 to discuss what Inspections need to be called and at what times. | |
10/28/2022 | ENGR Grading Final | Partial Pass | ||
10/28/2022 | ENGR Grading Final | Partial Pass | ||
10/28/2022 | ENGR Grading Final | Partial Pass |