Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP20-0120
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2022 | ENGR Engineering Final | DROBERTS | Approved | Entered by NGARCIA3 - APPROVED 2235 E FORT LOWELL RD |
| 06/02/2022 | ENGR Engineering Final | DROBERTS | Approved | Entered by NGARCIA3 - APPROVED 2233 E FORT LOWELL RD |
| 06/02/2022 | ENGR Engineering Final | DROBERTS | Approved | Entered by NGARCIA3 - APPROVED 2229 E FORT LOWELL RD |
| 06/02/2022 | ENGR Engineering Final | DROBERTS | Approved | Entered by NGARCIA3 - APPROVED 2225 E FORT LOWELL RD |
| 09/28/2022 | ENGR Engineering Final | BBENEDON | Continued | Entered by VVERA1 - Continued. Plans under review. Material and debris piles remain in parking area. Accessible parking space has not been constructed |
| 08/23/2022 | ENGR Engineering Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Materials stored where accessible parking space is shown. No change since last inspection 2225 E Fort Lowell Rd |
| 08/11/2022 | ENGR Engineering Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. No change since last inspection. Material piles in private parking spaces. No accessible parking or signage installed at this time. 2225 E Fort Lowell Rd |
| 07/19/2022 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by NGARCIA3 - Not ready. No change since last inspection 2225 E Fort Lowell Rd |
| 06/28/2022 | ENGR Engineering Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Landscaping, parking and clean up in progress. Material piles remain in private Rodeway 2225 E Fort Lowell Rd, |
| 06/17/2022 | ENGR Engineering Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Jeff working towards completion of final grading, basin installation, also parking spaces, wheel stops, accessible striping and signage. Call for final inspection once work has been completed. 2235 E FORT LOWELL RD |
| 06/17/2022 | ENGR Engineering Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. For completion of remaining work. 2233 E FORT LOWELL RD |
| 06/17/2022 | ENGR Engineering Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. For completion of remaining work. 2229 E FORT LOWELL RD |
| 06/16/2022 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - FOR ADDRESSES: 2235, 2233, 2229: 09185. Continued. Two of the three bollards installed. Center bollard shown to be removable. No other activity on site at this time. Basin and landscape areas in complete. Guest and accessible parking areas are in complete. 09030. Not ready. Accessible parking signage has not been installed. 09028. Not ready. |
| 06/16/2022 | ENGR Engineering Final | DROBERT5 | Partial Approval | Entered by DROBERT5 - FINAL NOT TO BE GIVEN TILL ALL BASIN IS COMPLETE THE APPROVED PLANS |
| 06/16/2022 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by NGARCIA3 - Not ready. Accessible parking space is not ready at this time. 2225 E FORT LOWELL RD |
| 06/02/2022 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by NGARCIA3 - NOT READY 2235 E FORT LOWELL RD |
| 06/02/2022 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by NGARCIA3 - NOT READY 2233 E FORT LOWELL RD |
| 06/02/2022 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by NGARCIA3 - NOT READY 2229 E FORT LOWELL RD |
| 06/02/2022 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by NGARCIA3 - IS NOT READY 2225 E FORT LOWELL RD |
| 06/01/2022 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VVERA1 - Not ready. Conversation with superintendent Geoff about following plan specifications and details. And completing all work as shown. Also conversations regarding Calling in for all remaining inspections as needed working towards completion of project. |
| 05/27/2022 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by NGARCIA3 - Not ready. Slope discrepancy at entry. Provide city approve plan revision or make corrections. |