Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP20-0115
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
08/30/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - THE OWNER AND THE CONTRACTOR WILL BE SEEKING TO PLACE PHASING LINES ON THIS PLAN, BUT WILL BE WANTING THE FULL CERTIFICATE OF OCCUPANCY FOR THE BUILDS THAT ARE ALMOST CONSTRUCTED AT THIS TIME |
12/01/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Project nearing completion. Material and debris piles still on site. Construction active. |
05/21/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VLEON1 - Continued. trash enclosure has already been constructed. |
03/18/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VLEON1 - CONTINUE UTILITY WORK BACKFILL. JOHN WITH BAKER |
12/02/2021 | ENGR Grading Final | BBENEDON | Not ready for Inspection | Entered by VVERA1 - Not ready. Provide photo documentation to ensure compliance with detail 601. |
12/02/2021 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by VVERA1 - Partially approved. Walkways where completed. Schedule for inspections of remaining work shown on approved plans. |
08/30/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - MET WITH THE CONTRACTOR TO LOOK OVER THE SITE AND SEE WHAT THEY WILL BE LOOKING AT IN THE NEXT FEW WEEKS. THEY ARE ASKING WHAT IT WOULD TAKE TO PHASE PORTIONS OF THIS WORK, SOME OF THE ITEMS ARE IN FOR REVIEW AT THIS TIME. I HAVE ADVISED THEM TO CONTACT JUAN GARCIA, AND THE ZONING AND ENGINEERING REVIEWERS TO SEE IF THERE ARE ANY ISSUES WITH HOW THEY WANT TO PHASE THIS PROJECT. |
08/18/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - Continued. Debris piles and other construction materials on site. Project appears to be nearing completion. No history shown for trash enclosure. |
07/21/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VLEON1 - Continue. Driveway installation. Material and debris piles on site. Native Cactus stored. Concrete containment |
07/07/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Utility work in progress along site entrance. Concrete containment structure in place. |
06/16/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VLEON1 - Continued. Contractor installing perimeter fencing. Material and debris stock piles on site |
05/14/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VLEON1 - |
02/09/2021 | ENGR Grading Final | BVENEDON | Continued | Entered by VLEON1 - Continued. Contractor installing building drains. John with Barker informed to call for inspections from building permit for piping within building foundation. |
02/04/2021 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by VLEON1 - PARTIAL - APPROVAL HDPE STORM DRAIN |
02/03/2021 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by VLEON1 - Partially approved. Stormwater piping, 18 inch HDPE west to east 200 feet, 130 feet to the north |
01/28/2021 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by VLEON1 - PARTIAL APPROVAL STORM TACK BELOW GROUND BASIN. JOHN WITH BARKER |
01/20/2021 | ENGR Grading Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready, Grading for basins. John with Barker Morrissey |