Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 02/03/2021 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by VLEON1 - NOT READY WORK IS STILL IN PROGRESS |
| 12/02/2021 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by VVERA1 - Partial approval for occupancy of new building structure. Complete all work shown on plans provide documentation as specified, schedule inspections as required. Revision 3 provided for change at dumpster location. |
| 01/09/2024 |
ENGR Engineering Final
|
|
Not Ready |
It is being discussed that the future work may not be done at this time and may be with drawn |