Permit: DP20-0112

Parcel: 10120036J

Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final Not Ready
10/27/2022 ENGR Engineering Final Not Ready
08/09/2022 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by NGARCIA3 - Not ready. Engineering has no issues that would prevent a temporary certificate of occupancy at this time. Building address not posted. Michael 981-8852. Provide. City approved plans for changes made. Complete all work. Correct slope accessible parking. Provide accessible walkway. Provide signage. Correct water harvesting areas. Install riprap with filter fabric as shown. Support landscaping per detail.
08/09/2022 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by NGARCIA3 - Not ready. Engineering has no issues that would prevent a temporary certificate of occupancy at this time. Building address not posted. Michael 981-8852. Provide. City approved plans for changes made. Complete all work. Correct slope accessible parking. Provide accessible walkway. Provide signage. Correct water harvesting areas. Install riprap with filter fabric as shown. Support landscaping per detail.
05/11/2023 ENGR Engineering Final Not Ready MET WITH THE OWNER AND DISCUSSED THE CHANGES THAT HAVE BEEN CHANGED AND ARE NOT REFLECTED ON THE APPROVED PLANS. THEY WILL ENSURE THAT ALL OF THE CHANGES ARE REFLECTED ON THE PLANS THAT ARE BEING SUBMITTED. A REIN-SPECTION OF THE SITE WILL BE REQUIRED PRIOR TO THE FINAL APPROVAL.