Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP20-0081
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
01/07/2022 | ENGR Engineering Final | DROBERTS | Approved | Entered by VVERA1 - IS APPROVED |
01/20/2022 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by DROBERT5 - CREWS WILL TRY TO COMPLETE THE HYDRO SEEDING FOR THIS SITE BY THE END OF THIS WEEK, AND THE ENGINEER OF RECORD IS WORKING ON THE DRAINAGE ISSUE BEING PAST 12 HOURS. ENGINEERING WILL APPROVE THE COMBO IF IT IS REQUOIRED FOR A FULL C OF O, BUT WE ARE NOT ON THE PERMIT AT THIS TIME. |
01/07/2022 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by VVERA1 - IS PARTIAL, PROVIDE THE CERTIFICATION LETTER FROM THE ENGINEER OF RECORD, PROVIDE APPROVED REVISED DRAWINGS FOR CHANGES MADE TO THE SITE, HAVE THE ENGINEER OF RECORD ADDRESS STANDING WATER IN THE BASIN AT THE NORTH WEST CORNER OF THE SITE. |