Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 11/23/2021 |
ENGR Engineering Final
|
DROBERTS |
Not ready for Inspection |
Entered by RSALDAT1 - NOT READY AT THIS TIME, MET WITH GLENN FROM G AND J DEVELOPMENT AND
WE WALKED THE SITE TO SEE WHAT ISSUES I COULD FIND. SOME OF THE NEW SIDEWALKS ARE NON COMPLUANT FOR CROSS SLOPE(EXCEEDS 2% MAXIMUM), ROOFS DRAIN EITHER DIRECTLY ONTO SIDEWALKS OR INTO PLANTERS THAT DRAIN DIRECTLY ONTO SIDEWALKS. I HAVE ASK G & J TO HAVE THEIR ENGINEER OF RECORD ADDRESS THIS WITH EITHER THE BUILDING OFFICIAL OR OUR REVIEWERS. |
| 12/19/2022 |
ENGR Engineering Final
|
|
Passed |
The sidewalk that was a NONCOMPLIANT has been replaced and its goog. |