Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP20-0068
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
01/04/2023 | ENGR Grading Final | Complete (Recurring) | ||
01/04/2023 | ENGR Grading Final | Complete (Recurring) | ||
01/04/2023 | ENGR Grading Final | Complete (Recurring) | Continued. Work in progress. Material and debris piles on site. | |
01/04/2023 | ENGR Grading Final | Complete (Recurring) | Material and debris piles on site. | |
02/13/2023 | ENGR Grading Final | Complete (Recurring) | Grading for parking lot | |
02/13/2023 | ENGR Grading Final | Complete (Recurring) | Grading for the parking lot | |
02/13/2023 | ENGR Grading Final | Complete (Recurring) | Grading for the parking lot | |
02/13/2023 | ENGR Grading Final | Complete (Recurring) | Waiting for the parking lot | |
03/06/2023 | ENGR Grading Final | Not Ready | The following items will still need to be addressed prior to closing this permit for the final. 1) Complete all work is shown on the approved plans or revise drawings for this site. 2) Redo the handicap parking signs for the The two handicap parking spaces, design bottoms on the post will need to be heightened, so that they are at least 7 feet above the existing grade currently in approximately 5 feet. 3) Install the long-term bicycle parking structure and shown on the approved plans west of the building south of the parking lot. |
|
03/06/2023 | ENGR Grading Final | Not Ready | The following items will still need to be addressed prior to closing this permit for the final. 1) Complete all work is shown on the approved plans or revise drawings for this site. 2) Redo the handicap parking signs for the The two handicap parking spaces, design bottoms on the post will need to be heightened, so that they are at least 7 feet above the existing grade currently in approximately 5 feet. 3) Install the long-term bicycle parking structure and shown on the approved plans west of the building south of the parking lot. |
|
03/06/2023 | ENGR Grading Final | Not Ready | The following items will still need to be addressed prior to closing this permit for the final. 1) Complete all work is shown on the approved plans or revise drawings for this site. 2) Redo the handicap parking signs for the The two handicap parking spaces, design bottoms on the post will need to be heightened, so that they are at least 7 feet above the existing grade currently in approximately 5 feet. 3) Install the long-term bicycle parking structure and shown on the approved plans west of the building south of the parking lot. |
|
03/06/2023 | ENGR Grading Final | Not Ready | The following items will still need to be addressed prior to closing this permit for the final. 1) Complete all work is shown on the approved plans or revise drawings for this site. 2) Redo the handicap parking signs for the The two handicap parking spaces, design bottoms on the post will need to be heightened, so that they are at least 7 feet above the existing grade currently in approximately 5 feet. 3) Install the long-term bicycle parking structure and shown on the approved plans west of the building south of the parking lot. |
|
05/04/2023 | ENGR Grading Final | Passed | ||
05/04/2023 | ENGR Grading Final | Passed | ||
05/04/2023 | ENGR Grading Final | Passed | ||
05/04/2023 | ENGR Grading Final | Passed | ||
10/28/2022 | ENGR Grading Final | Re-inspection required | ||
11/08/2022 | ENGR Grading Final | Complete (Recurring) | ||
11/09/2022 | ENGR Grading Final | Complete (Recurring) | Not ready, Damien with Concord. Trying to get a pre-grout inspection for his building. Having trouble with the new permitting system. I told him to continue to contact Inspector and explain the situation and to provide video documentation | |
11/09/2022 | ENGR Grading Final | Complete (Recurring) | Not ready. Work in progress. Superintendent not on site. No contact information provided. | |
11/09/2022 | ENGR Grading Final | Complete (Recurring) | Partially approved | |
11/09/2022 | ENGR Grading Final | Complete (Recurring) | Partially approved Concord construction, excavating for perimeter wall footing | |
11/09/2022 | ENGR Grading Final | Deferred | Not ready | |
11/21/2022 | ENGR Grading Final | Complete (Recurring) | MET ON-SITE WITH KIMBERLY AND DISCUSSED THE WORK THAT THEY ARE DOING FOR KIA. SHE ASKED FOR AN INSPECTION OF THE RETAINING WALL FOOTER ALONG THE SOUTH SIDE PARKING LOT TO ALLOW FOR THE NEW PARKING AREA TO BE RAISED. I ADVISED HER THAT THIS INSPECTION IS TO BE DONE BY THE BUILDING INSPECTORS UNDER A RETAINING WALL PERMIT, UNLESS IT HAS BEEN ATTACHED TO THE COMBINATION PERMIT FOR THE NEW BUILDING. | |
11/22/2022 | ENGR Grading Final | Complete (Recurring) | ||
12/02/2022 | ENGR Grading Final | Complete (Recurring) | ||
12/02/2022 | ENGR Grading Final | Complete (Recurring) | Contractor installing retaining wall at South parking area. | |
12/02/2022 | ENGR Grading Final | Complete (Recurring) | Partially approved. Retaining wall |