Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 03/24/2025 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
For the contractor, he need to put wattles all around the perimeter and call in for swap inspection every two weeks. Also informed him about the material testing and the trash enclosures. |