Permit: DP20-0060

Parcel: 11306142J


Addresses:

3205 N CAMPBELL AV


Inspection Status: Not Ready

Inspection History: For trash and recycling enclosures

Permit Number - DP20-0060

Inspection Description - For trash and recycling enclosures

Inspection Status - Not Ready

Date Description Inspector Results Comments
09/08/2025 For trash and recycling enclosures Not Ready 9/8/25
Footing inspection. Approved RE uses TSM sec 8. Fig 3a, but with wall OD's smaller than standard. Walls are 11'-8" x 26'-8". Contractor used a wall/footer plan w/ larger footer than TSM. As currently layed out bollards will be in conflict with continuous rebars.
Bollard footers should be dug and placed with correct clearances without conflicting with continuous rebars.
call inspection inspection when footer ready
09/10/2025 For trash and recycling enclosures Partial Pass 9/10/25
Footer and reinforcement now has clearance for bollards. Remove any loose dirt to maintain 3" clearance to rebar before pouring. Okay to pour footer.
Build wall to plan. Call us back in for pre grout inspection when wall either is built to 4 courses high or to top but with bond beam at top and clean out holes in reinforced cells at footer. Also call us out for to look at bollard footers and rebar mat in slab.
09/16/2025 For trash and recycling enclosures Partial Pass 9/16/25
Wall built to 6' -Bond beam in place. Weep holes are in bottom of reinforced cells. Contractor will grout all cells. Vibrate cells without weeps. Okay to grout wall
09/30/2025 For trash and recycling enclosures Partial Pass 9/30/25
Reinforcing correct. Slope correct. Submit compaction report to the permit.
Okay to pour slab.

Make sure to call in Flatwork inspections for sidewalk. If needed call in site consultation and put into notes that it is a Flatwork inspection.

Fix Trackout and clean up dirt that has been tracked offsite.
10/15/2025 For trash and recycling enclosures Partial Pass 9/30/25
Reinforcing correct. Slope correct. Submit compaction report to the permit.
Okay to pour Apron.
Clean street and sidewalk of dirt from storm...Recondition Trackout with 2" plus rock
Call in inspection before pouring all sidewalk and other Flatwork. Submit compaction under sidewalk to portal