Permit: DP20-0060

Parcel: 11306142J


Addresses:

3205 N CAMPBELL AV


Inspection Status: Partial Pass

Inspection History: ENGR Paving

Permit Number - DP20-0060

Inspection Description - ENGR Paving

Inspection Status - Partial Pass

Date Description Inspector Results Comments
10/21/2025 ENGR Paving Partial Pass 10/21/25 Drive through North of building.
Elevations to survey.
Subgrade compacted to over 95%. Depth are 7 inches. Slope is .5 away from building and .5 to the west and there is a break further east where it runs just over 1% downgrade to the west. Slope correct. There is a traffic rated grease interceptor and clean out that are a couple inches proud and concrete will slope up and transition smoothly to them. Cylinders will be taken and submitted to the portal along with compaction reports. Okay to pour drive through pending pictures of loose areas whacked down and smoothed.
11/20/2025 ENGR Paving Partial Pass I gave the contractor a partial pass. We strung line the Grade there was. some areas were high and other areas were low needs to re-grade it contractors would like to pave on Friday. contractor will call in for reinspection on Friday.