Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP20-0058
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/23/2021 | ENGR Engineering Final | BBENEDON | Approved | Entered by VLEON1 - APPROVED FOR 4206 N 1ST AV - Approved. Please change permit status to final. |
05/26/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - NOT READY FOR 4206 N 1ST AV - CONSTRUCTION DEBRIS STILL REMAINS ON SITE |
03/02/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - NOT READY FOR 4206 N 1ST AVE CONSTRUCTION DEBRIS AND TEMPORARY TOILES REMAIN ON SITE |
02/05/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - 4206 N 1ST AVE - Not ready |
02/05/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - NOT READY FOR 4602 N 1ST AVE - BARRICADES, DEBRIS AND CONSTRUCTION EQUIPMENT STILL REMAIN ON SITE |
01/22/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - Not ready. Location of original enclosure has been repaired. New enclosure is still under construction. Construction debris remain on empty portion of lot |
01/08/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready |
01/08/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - |
01/08/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - |
01/08/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - FOR 4240 N 1ST AV - Not ready. Contractor grading area of demolition. Construction materials and debris and barricades on site. |
01/08/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - FOR 4206 N 1ST AV - Not ready. Contractor grading area of demolition. Construction materials and debris and barricades on site. |
01/06/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - NR FOR 4280 N 1ST AV - Not ready. Inspection is for trash enclosure rebar for slab. And Ballard installation. OK for concrete. Leo at 661-7634. |
01/06/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - NR FOR 4240 N 1ST AV |
01/06/2021 | ENGR Engineering Final | TTREMBULAK | Not ready for Inspection | Entered by VLEON1 - NR FOR 4214 N 1ST AVE |
01/06/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - Not ready. Inspection is for trash enclosure rebar for slab. And Ballard installation. OK for concrete. Leo at 661-7634. |
01/06/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - 09027. Not ready. Inspection is for trash enclosure rebar for slab. And Ballard installation. OK for concrete. Leo at 661-7634. |
01/05/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - 09027. Not ready. Inspection of trash enclosure slab and bollards. |
12/18/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready. Pre-grout inspection of new trash enclosure. Temporary barricade fencing, debris and material piles and disturbed and stabilized dirt in various locations on site.Existing enclosure has been partially demolished. Track out is contained within private parking area. |
12/18/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready. Pre-grout inspection. Temporary barricade fencing, debris and material piles and disturbed and stabilized dirt in various locations on site. |
12/18/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready |
12/18/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready. Leo is looking for a 1 PM pre-grout inspection and will contact Inspector as soon as work is ready. |
11/25/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by PAHUMAD1 - Not ready. Trash enclosure footing OK |
11/25/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by PAHUMAD1 - Not ready. Trash enclosure footing OK |
11/25/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by PAHUMAD1 - Not ready. Inspection for enclosure footing. Leo 661-7634. Remote inspection. Insure that vertical rebar is installed at 32 inches on center. Next inspection will be for pre-grout. |