Permit: DP20-0058

Parcel: 105102710


Addresses:

4206 N 1ST AV


Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP20-0058

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
06/23/2021 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 4206 N 1ST AV - Approved. Please change permit status to final.
05/26/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by VLEON1 - NOT READY FOR 4206 N 1ST AV - CONSTRUCTION DEBRIS STILL REMAINS ON SITE
03/02/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by VLEON1 - NOT READY FOR 4206 N 1ST AVE CONSTRUCTION DEBRIS AND TEMPORARY TOILES REMAIN ON SITE
02/05/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - 4206 N 1ST AVE - Not ready
02/05/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by VLEON1 - NOT READY FOR 4602 N 1ST AVE - BARRICADES, DEBRIS AND CONSTRUCTION EQUIPMENT STILL REMAIN ON SITE
01/22/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by VLEON1 - Not ready. Location of original enclosure has been repaired. New enclosure is still under construction. Construction debris remain on empty portion of lot
01/08/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready
01/08/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by VLEON1 -
01/08/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by VLEON1 -
01/08/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by VLEON1 - FOR 4240 N 1ST AV - Not ready. Contractor grading area of demolition. Construction materials and debris and barricades on site.
01/08/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by VLEON1 - FOR 4206 N 1ST AV - Not ready. Contractor grading area of demolition. Construction materials and debris and barricades on site.
01/06/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by VLEON1 - NR FOR 4280 N 1ST AV - Not ready. Inspection is for trash enclosure rebar for slab. And Ballard installation. OK for concrete. Leo at 661-7634.
01/06/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by VLEON1 - NR FOR 4240 N 1ST AV
01/06/2021 ENGR Engineering Final TTREMBULAK Not ready for Inspection Entered by VLEON1 - NR FOR 4214 N 1ST AVE
01/06/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by VLEON1 - Not ready. Inspection is for trash enclosure rebar for slab. And Ballard installation. OK for concrete. Leo at 661-7634.
01/06/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - 09027. Not ready. Inspection is for trash enclosure rebar for slab. And Ballard installation. OK for concrete. Leo at 661-7634.
01/05/2021 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - 09027. Not ready. Inspection of trash enclosure slab and bollards.
12/18/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Pre-grout inspection of new trash enclosure. Temporary barricade fencing, debris and material piles and disturbed and stabilized dirt in various locations on site.Existing enclosure has been partially demolished. Track out is contained within private parking area.
12/18/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Pre-grout inspection. Temporary barricade fencing, debris and material piles and disturbed and stabilized dirt in various locations on site.
12/18/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready
12/18/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Leo is looking for a 1 PM pre-grout inspection and will contact Inspector as soon as work is ready.
11/25/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by PAHUMAD1 - Not ready. Trash enclosure footing OK
11/25/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by PAHUMAD1 - Not ready. Trash enclosure footing OK
11/25/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by PAHUMAD1 - Not ready. Inspection for enclosure footing. Leo 661-7634. Remote inspection. Insure that vertical rebar is installed at 32 inches on center. Next inspection will be for pre-grout.