Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
08/03/2022 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by VVERA1 - Partially approved. Perimeter Block wall northwest corner. Please provide contact information when scheduling inspections. |
07/29/2022 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by NGARCIA3 - IS PARTIAL, LOOKED AT THE DROP INLET STRUCTURES AND RCP PIPE RUNS, EVERYTHING LOOKS OK. THE CONTRACTOR WILL NOT POUR THE AREAS TILL NEXT WEEK SO MARTIN WILL INSPECT THE STRUCTURES ONCE AGAIN ONCE ALL THE REBAR HAS BEEN PLACED. 2805 S PARK AV |
07/29/2022 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by NGARCIA3 - PARTIAL, LOOKED AT THE DROP INLET STRUCTURES AND RCP PIPE RUNS, EVERYTHING LOOKS OK. THE CONTRACTOR WILL NOT POUR THE AREAS TILL NEXT WEEK SO MARTIN WILL INSPECT THE STRUCTURES ONCE AGAIN ONCE ALL THE REBAR HAS BEEN PLACED. 1002 E 36TH ST |
07/28/2022 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN GOOD TO POUR CATCH BASIN WALL FOR 1,2,3, THERE IS A DRAINAGE R.C.P. BY CATCH NUMBER 3. 2805 S PARK AV |
07/28/2022 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN GOOD TO POUR CATCH BASIN WALL FOR 1,2,3, THERE IS A DRAINAGE R.C.P. BY CATCH NUMBER 3. 1002 E 36TH ST |
07/25/2022 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VVERA1 - CN FOR CATCH BASIN #1,#2,#3 |
07/25/2022 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VVERA1 - CN FOR CATCH BASIN #1,#2,#3 |
07/06/2022 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VVERA1 - CN /CONTRACTOR WILL TAKE A PHOTO OF THE REBAR BEFORE THEY POUR TODAY. |
07/05/2022 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VVERA1 - CN NEED TO RESCHEDULE NOT READY FOR INSPECTION. CATCH BASIN |
01/20/2022 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VVERA1 - CN/ FORMING AND SETTING #4 BAR FOR ADOT COLLAR.FROM 42” EXISTING TO NEW 42” . |
08/11/2022 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN 2805 S Park Ave |
08/03/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - Continued. Please provide contact information and scheduling inspections. |
02/07/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - MET WITH THE CONTRACTOR TO SEE WHAT IS HAPPENING ON-SITE AT THIS TIME. CREWS CONTINUE TO PLACE UTILITY PIPE THAT IS BEING INSPECTED BY OTHERS. I PICKED UP A COPY OF THE BACKFILL SPECS FOR THE HDPE PIPEON THIS SITE. |
02/04/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - CONTINUED AT THIS TIME, CREWS CONTINUE TO WORK ON PIPE INSTALLATIONS AT VARIOUS LOCATIONS ON THIS SITE. I HAVE RAISED QUESTIONS ABOUT THE TRENCHES BEING TO NARROW FOR BURYING HDPE |
02/04/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by NGARCIA3 - CONTINUED AT THIS TIME, CREWS CONTINUE TO WORK ON PIPE INSTALLATIONS AT VARIOUS LOCATIONS THROUGHOUT THIS SITE. 2805 S PARK AV |
02/04/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by NGARCIA3 - CONTINUED AT THIS TIME, CREWS CONTINUE TO WORK ON PIPE INSTALLATIONS AT VARIOUS LOCATIONS ON THIS SITE. 1002 E 36TH ST |
01/27/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - MET WITH REPRESENTATIVES FROM ADEQ AND WALKED THE SITE TO VERIFY THE SITE CONDITIONS, NO CONCERNS NOTED BY ADEQ DURING THIS SITE VISIT. |
01/24/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - MET WITH BFL TO SEE WHAT THEY ARE PLANING IN THE FUTURE AS WORK ON THIS SITE. CURRENTLY THEY ARE STARTING THE TIE-INS FOR THE SEWER AND THE WATER LINES AT PARK AVENUE NEAR 37TH STREET, I HAVE REMINDED THEM TO CALL IN THE APPROPRIATE INSPECTIONS. |
12/10/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VVERA1 - IS CONTINUED, SITE WORK CONTINUES AT THIS TIME, NO ONE ON SITE DUE TO THE RAIN LAST NIGHT. |
01/19/2024 | ENGR Grading Final | Partial Pass | Grading thru out various locations on site is still in progress. | |
01/19/2024 | ENGR Grading Final | Passed | ||
01/19/2024 | ENGR Grading Final | Passed | ||
01/23/2024 | ENGR Grading Final | Partial Pass | Grading thru out site continues. | |
01/24/2024 | ENGR Grading Final | Partial Pass | Grading areas are still in progress. | |
02/02/2024 | ENGR Grading Final | Partial Pass | Grading continues around SE corner of site for footing for wrought iron exterior perimeter fence and gate. Small areas thru out units 50 thru 129 are to be graded. |
|
02/07/2023 | ENGR Grading Final | Complete (Recurring) | It’s floor for trash enclosure at the far south end of project | |
02/07/2023 | ENGR Grading Final | Complete (Recurring) | Set in the rebar for the floors for trash enclosures the one on the southside of the entrance good pour. | |
02/08/2024 | ENGR Grading Final | Passed | ||
02/22/2023 | ENGR Grading Final | Complete (Recurring) | Contact contractor had questions about handicap ramp I showed him detail 238–1 | |
02/22/2023 | ENGR Grading Final | Complete (Recurring) | Contractor had questions about the handicap ramp I showed him detailed 238 – one | |
02/22/2023 | ENGR Grading Final | Complete (Recurring) | Contractor had questions about the handicap ramps so I showed him the detail of two 38–1 | |
02/24/2023 | ENGR Grading Final | Complete (Recurring) | ||
02/24/2023 | ENGR Grading Final | Complete (Recurring) | ||
02/24/2023 | ENGR Grading Final | Complete (Recurring) | Canceled Horace | |
08/23/2023 | ENGR Grading Final | Not Ready | Units #2 thru #25 to be re-called when completed 100% | |
08/23/2023 | ENGR Grading Final | Not Ready | Units #2 thru #25 to be re-called when completed 100% | |
08/23/2023 | ENGR Grading Final | Not Ready | Units #2 thru #25 to be re-called when completed 100% | |
11/08/2023 | ENGR Grading Final | Partial Pass | Handicap parking space located in front of building (26) (2) (45) asphalt was removed and replaced and all percentages verified not to exceed 2% and striping competed. Rip Rap located building (45) and tree stakes located at center North section of parking lot will be completed next week and inspection recalled. |
|
11/18/2022 | ENGR Grading Final | Partial Pass | ||
11/21/2022 | ENGR Grading Final | Complete (Recurring) | Trash enclosure footers OK to pour | |
12/08/2022 | ENGR Grading Final | Complete (Recurring) | Grouting one of the trash enclosures it’s good |