10/27/2022 ENGR Engineering Final Not Ready
10/27/2022 ENGR Engineering Final Not Ready
08/03/2022 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by VVERA1 - Not ready. Please provide contact information on scheduling inspections.
01/19/2024 ENGR Engineering Final Partial Pass
01/19/2024 ENGR Engineering Final Passed
01/23/2024 ENGR Engineering Final Partial Pass
01/24/2024 ENGR Engineering Final Partial Pass
02/02/2024 ENGR Engineering Final Not Ready Complete all remaining work and cleanup of the site
02/08/2024 ENGR Engineering Final Partial Pass TC Of O Level 4 Fencing located at the North Center area located by mailbox station needs to be removed.

Fencing located at the SE corner of basin area needs to be removed.

South end center of parking lot storm water inlet basin area needs to be adjusted by Bright View Landscaping.

Center East area of parking lot has a roll off dumpster steel wheel indentation that needs to be repaired.
02/13/2024 ENGR Engineering Final Passed
08/23/2023 ENGR Engineering Final Not Ready Contractor still needs to put riprap in where scuppers are at the curb porch need to be completed. Add plant forms need to be in place.
08/23/2023 ENGR Engineering Final Not Ready Contractor still needs to put riprap in where scuppers are at the curb porch need to be completed. Add plant forms need to be in place.
11/08/2023 ENGR Engineering Final Partial Pass Handicap parking space located in front of building (26) (2) (45) asphalt was removed and replaced and all percentages verified not to exceed 2% and striping competed.

Rip Rap located building (45) and tree stakes located at center North section of parking lot will be completed next week and inspection recalled.
12/20/2022 ENGR Engineering Final Complete (Recurring) Place to steal for the floor and the apron for the trash enclosure on the north west side of project