Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP20-0045
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
10/27/2022 | ENGR Engineering Final | Not Ready | ||
08/03/2022 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VVERA1 - Not ready. Please provide contact information on scheduling inspections. |
01/19/2024 | ENGR Engineering Final | Partial Pass | ||
01/19/2024 | ENGR Engineering Final | Passed | ||
01/23/2024 | ENGR Engineering Final | Partial Pass | ||
01/24/2024 | ENGR Engineering Final | Partial Pass | ||
02/02/2024 | ENGR Engineering Final | Not Ready | Complete all remaining work and cleanup of the site | |
02/08/2024 | ENGR Engineering Final | Partial Pass | TC Of O Level 4 Fencing located at the North Center area located by mailbox station needs to be removed. Fencing located at the SE corner of basin area needs to be removed. South end center of parking lot storm water inlet basin area needs to be adjusted by Bright View Landscaping. Center East area of parking lot has a roll off dumpster steel wheel indentation that needs to be repaired. |
|
02/13/2024 | ENGR Engineering Final | Passed | ||
08/23/2023 | ENGR Engineering Final | Not Ready | Contractor still needs to put riprap in where scuppers are at the curb porch need to be completed. Add plant forms need to be in place. | |
08/23/2023 | ENGR Engineering Final | Not Ready | Contractor still needs to put riprap in where scuppers are at the curb porch need to be completed. Add plant forms need to be in place. | |
11/08/2023 | ENGR Engineering Final | Partial Pass | Handicap parking space located in front of building (26) (2) (45) asphalt was removed and replaced and all percentages verified not to exceed 2% and striping competed. Rip Rap located building (45) and tree stakes located at center North section of parking lot will be completed next week and inspection recalled. |
|
12/20/2022 | ENGR Engineering Final | Complete (Recurring) | Place to steal for the floor and the apron for the trash enclosure on the north west side of project |