Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - Landscaping
Permit Number - DP20-0045
Inspection Description - PDSD Site/Engineering Division - Landscaping
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
10/27/2022 | PDSD Site/Engineering Division - Landscaping | Not Ready | ||
01/19/2024 | PDSD Site/Engineering Division - Landscaping | Partial Pass | Landscape is in progress on West front of site along Park ave. tree stakes should be completed by 01/22/23. | |
01/19/2024 | PDSD Site/Engineering Division - Landscaping | Passed | ||
01/23/2024 | PDSD Site/Engineering Division - Landscaping | Partial Pass | Stakes for trees on West front of building is still in progress. | |
01/24/2024 | PDSD Site/Engineering Division - Landscaping | Partial Pass | Landscape areas are still in progress. | |
02/02/2024 | PDSD Site/Engineering Division - Landscaping | Partial Pass | Areas in front of exterior block walls facing Park avenue and between common areas between unit 50 thru 129 still need landscape rock adjusted and floated out. | |
02/08/2024 | PDSD Site/Engineering Division - Landscaping | Partial Pass | Landscape rock area located at the south East corner of parking lot in front of wrought iron fence needs to be floated out. Storm water inlet basin area located at the center south end of parking lot needs to be adjusted by Bright View Landscaping. |
|
02/13/2024 | PDSD Site/Engineering Division - Landscaping | Passed | ||
08/23/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | Spoke with Superintendent Ramon regarding units #2 #3 #4 regarding drainage block facing South wall in courtyard are to high to drain and grade on opposite side of South wall will need to be addressed when drainage blocks are lowered. | |
08/23/2023 | PDSD Site/Engineering Division - Landscaping | Not Ready | To be re-called for units #2 thru #25 when completed 100 % | |
12/19/2022 | PDSD Site/Engineering Division - Landscaping | Complete (Recurring) | Landscaping is not ready to be inspected |