Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP20-0042
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/24/2020 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Approved | Entered by RSALDAT1 - Approved |
06/24/2020 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Approved | Entered by RSALDAT1 - Approved. Preconstruction meeting with Oscar from Chestnut at 576-8005. Steve Shell Architect, alex Hines city project manager. Repaving shopping center in three phases. Reconstructing accessible parking, and ramps. Contractor will install stormwater protections as needed. |