Permit: DP20-0042

Parcel: 11309225A


Addresses:

2402 N 1ST AV

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
06/24/2020 PDSD Engineering Division Pre-Construction SITE BBENEDON Approved Entered by RSALDAT1 - Approved
06/24/2020 PDSD Engineering Division Pre-Construction SITE BBENEDON Approved Entered by RSALDAT1 - Approved. Preconstruction meeting with Oscar from Chestnut at 576-8005. Steve Shell Architect, alex Hines city project manager. Repaving shopping center in three phases. Reconstructing accessible parking, and ramps. Contractor will install stormwater protections as needed.