Permit: DP20-0042

Parcel: 11309225A


Addresses:

2402 N 1ST AV

Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
06/23/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued FOR 2430 N 1ST AV. Note, all inspections have been approved. Stabilization as promised was not installed. There’s no activity in vacant lot at this time.
12/08/2020 ENGR Grading Final BBENEDON Approved Entered by PAHUMAD1 -
10/01/2020 ENGR Grading Final BBENEDON Approved Entered by JSCHNEI2 - Approved
10/01/2020 ENGR Grading Final BBENEDON Approved Entered by JSCHNEI2 - Approved
10/01/2020 ENGR Grading Final BBENEDON Approved Entered by JSCHNEI2 - Approved.
10/01/2020 ENGR Grading Final BBENEDON Approved Entered by JSCHNEI2 - Approved.
10/01/2020 ENGR Grading Final BBENEDON Approved Entered by JSCHNEI2 - Approved.
10/01/2020 ENGR Grading Final BBENEDON Approved Entered by JSCHNEI2 - Approved.
10/01/2020 ENGR Grading Final BBENEDON Approved Entered by JSCHNEI2 - Approved.
10/01/2020 ENGR Grading Final BBENEDON Approved Entered by JSCHNEI2 - Approved.
10/01/2020 ENGR Grading Final BBENEDON Approved Entered by JSCHNEI2 - approved
10/01/2020 ENGR Grading Final BBENEDON Approved Entered by JSCHNEI2 - Approved.
10/01/2020 ENGR Grading Final BBENEDON Approved Entered by JSCHNEI2 - Approved.
10/01/2020 ENGR Grading Final BBENEDON Approved Entered by JSCHNEI2 - approved
10/01/2020 ENGR Grading Final BBENEDON Approved Entered by JSCHNEI2 - approved
10/01/2020 ENGR Grading Final BBENEDON Approved Entered by JSCHNEI2 - approved
10/01/2020 ENGR Grading Final BBENDON Approved Entered by JSCHNEI2 - approved
10/01/2020 ENGR Grading Final BBENDON Approved Entered by JSCHNEI2 - approved
10/01/2020 ENGR Grading Final BBENEDON Approved Entered by JSCHNEI2 - Approved
10/01/2020 ENGR Grading Final BBENEDON Approved Entered by RSALDAT1 - Approved
10/01/2020 ENGR Grading Final BBENEDON Approved Entered by RSALDAT1 - approved
11/18/2020 ENGR Grading Final BBENEDON Partial Approval Entered by PAHUMAD1 - Partially approved. Grading and paving. One last section remains.
11/18/2020 ENGR Grading Final BBENEDON Partial Approval Entered by PAHUMAD1 - Partially approved. Grading and paving. One last section remains.
11/18/2020 ENGR Grading Final BBENEDON Partial Approval Entered by PAHUMAD1 - Partially approved. Grading and paving. One last section remains.
11/18/2020 ENGR Grading Final BBENEDON Partial Approval Entered by PAHUMAD1 - Partially approved. Grading and paving. One last section remains.
11/06/2020 ENGR Grading Final BBENEDON Partial Approval Entered by PAHUMAD1 - Partially approved. Grading in landscape islands.
11/04/2020 ENGR Grading Final BBENEDON Continued Entered by PAHUMAD1 - Continued. Removal of excess materials in progress.
10/01/2020 ENGR Grading Final BBENEDON Partial Approval Entered by JSCHNEI2 - Partially approved. Accessible walkways, ramps and parking completed at this time.
10/01/2020 ENGR Grading Final BBENEDON Partial Approval Entered by JSCHNEI2 - Partially approved. Accessible walkways, ramps and parking completed at this time.
10/01/2020 ENGR Grading Final BBENEDON Partial Approval Entered by JSCHNEI2 - Partially approved. Accessible walkways, ramps and parking completed at this time.
10/01/2020 ENGR Grading Final BBENEDON Partial Approval Entered by JSCHNEI2 - Partially approved. Accessible walkways, ramps and parking completed at this time.
10/01/2020 ENGR Grading Final BBENEDON Partial Approval Entered by JSCHNEI2 - Partially approved. Accessible walkways, ramps and parking completed at this time.
10/01/2020 ENGR Grading Final BBENEDON Partial Approval Entered by JSCHNEI2 - Partially approved. Accessible walkways, ramps and parking completed at this time.
10/01/2020 ENGR Grading Final BBENEDON Partial Approval Entered by JSCHNEI2 - Partially approved. Accessible walkways, ramps and parking completed at this time.
10/01/2020 ENGR Grading Final BBENEDON Partial Approval Entered by JSCHNEI2 - Partially approved. Accessible walkways, ramps and parking completed at this time.
09/29/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - Continued. Oscar with Chesnut. Starting phase 3 north of the Bank and north of FireStone.
09/17/2020 ENGR Grading Final BBENEDON Partial Approval Entered by JSCHNEI2 - Partially approved. Parking spaces and walkway in front of Japanese restaurant in Barber OK.
09/09/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - Continued. Grading parking area. Dirt and debris piles on site in Lott with construction trailer
08/19/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. New asphalt and striping in phase 1. Existing pavement has been removed for phase 2 and is stockpiled on site. Rough grading has been established for parking islands in Phase 1. Contractor installing accessible path from Grant Road onto site.
08/12/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Depressed water harvesting areas Shall be 6 inches below curb opening or as shown on the plan.
08/04/2020 ENGR Grading Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Contractor is installing concrete walkways as shown. Oscar with Chesnut construction is checking slope to ensure project is within specifications.
08/04/2020 ENGR Grading Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Contractor is installing concrete walkways as shown. Oscar with Chesnut construction is checking slope to ensure project is within specifications.
07/22/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - Continued. Curb installation.
07/09/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - Continued. Contractor installing curbs, Magnum paving on site for grading
06/29/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Removing existing pavement. Stock piles on site. Trucks in and out. Oscar with Chestnut is on site. Job trailer.
06/29/2020 ENGR Grading Final RLEDONNE Approved Entered by RSALDAT1 - Continued. Removing existing pavement. Stock piles on site. Trucks in and out. Oscar with Chestnut is on site. Job trailer.
12/08/2020 ENGR Grading Final BBENEDON Approved Entered by PAHUMAD1 -
05/18/2023 ENGR Grading Final Passed