Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP20-0042

Parcel: 11309225A


Addresses:

2402 N 1ST AV


Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Permit Number - DP20-0042

Inspection Description - ENGR Engineering Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final Not Ready
10/27/2022 ENGR Engineering Final Not Ready
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 999 E GRANT RD - Oscar with Chestnut construction and design will provide required stabilization in undeveloped location as requested, Unless new development of site starts within 30 day
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 2430 N 1ST AVE - Oscar with Chestnut construction and design will provide required stabilization in undeveloped location as requested, Unless new development of site starts within 30 days.
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 985 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 945 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 901 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 885 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 865 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 863 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 861 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 859 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 855 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by RSALDAT1 - Approved 845 E. GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by RSALDAT1 - Approved 857 E. GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by RSALDAT1 - Approved 857 E. GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 811 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by RSALDAT1 - Approved 815 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - Approved FOR 801 E GRANT RD - Oscar with Chestnut construction and design will provide required stabilization in undeveloped location as requested, Unless new development of site starts within 30 days.
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - Approved. Oscar with Chestnut construction and design will provide required stabilization in undeveloped location as requested, Unless new development of site starts within 30 days.
12/30/2020 ENGR Engineering Final BBENEDON Partial Approval Entered by VLEON1 - Partially approved. Oscar with Chesnut construction. Stabilize undeveloped lot unless construction is to occur within 30 days. Remove temporary construction signage.
12/24/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready
12/15/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready
12/03/2020 ENGR Engineering Final BBENEDON Partial Approval Entered by PAHUMAD1 - Partially approved. Provide depressed landscape areas as specified by note number eight. Depression shall be lower than island inlet. Provide ground coverings specified. Remove excess materials, fencing, construction equipment. Toilets and dumpster.Oscar with Chestnut Chestnut
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 999 E GRANT RD - Oscar with Chestnut construction and design will provide required stabilization in undeveloped location as requested, Unless new development of site starts within 30 day
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 2430 N 1ST AVE - Oscar with Chestnut construction and design will provide required stabilization in undeveloped location as requested, Unless new development of site starts within 30 days.
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 945 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 901 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 885 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 865 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 863 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 861 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 859 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 855 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by RSALDAT1 - Approved 845 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by RSALDAT1 - Approved 853 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by RSALDAT1 - Approved 857 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - APPROVED FOR 811 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by RSALDAT1 - Approved 815 E GRANT RD
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - Approved FOR 801 E GRANT RD - Oscar with Chestnut construction and design will provide required stabilization in undeveloped location as requested, Unless new development of site starts within 30 days.
12/30/2020 ENGR Engineering Final BBENEDON Approved Entered by VLEON1 - Approved. Oscar with Chestnut construction and design will provide required stabilization in undeveloped location as requested, Unless new development of site starts within 30 days.
12/30/2020 ENGR Engineering Final BBENEDON Partial Approval Entered by VLEON1 - Partially approved. Oscar with Chesnut construction. Stabilize undeveloped lot unless construction is to occur within 30 days. Remove temporary construction signage.
12/15/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Laydown area has been cleared, however no stabilization has been applied. Note there are plans for future construction. Tractor still on site. Temporary fencing has been removed. Contractor signage still in place. Minor efforts have been made to correct landscape areas.
12/03/2020 ENGR Engineering Final BBENEDON Partial Approval Entered by PAHUMAD1 - Partially approved. Provide depressed landscape areas as specified by note number eight. Depression shall be lower than island inlet. Provide ground coverings specified.Remove excess materials, fencing, construction equipment. Toilets and dumpster.Oscar with Chestnut Chestnut
05/18/2023 ENGR Engineering Final Passed
05/18/2023 ENGR Engineering Final Passed