Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 02/17/2021 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by RSALDAT1 - . Approved. |
| 12/09/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by PAHUMAD1 - Continued. Dave or Luis with Solon. |
| 02/23/2021 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by VLEON1 - APPROVED |
| 02/23/2021 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by VLEON1 - APPROVED |
| 02/18/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Project is nearly complete. Dave with Solon. Not planning to stabilize disturbed earth because site is a floodplain. And not planning to remove temporary Stormwater controls
|
| 02/17/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Solar structures and arrays have been installed.
Temporary Stormwater controls are still in place. No stabilization of disturbed areas has been provided. Soil is extremely dry and silty and has been disturbed in excess of panel locations. Dave with Solon at 818-522-1702.
|
| 03/11/2021 |
ENGR Grading Final |
MHERNANDEZ |
Approved |
Entered by VLEON1 - |