Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 06/24/2025 |
ENGR Engineering Final
|
|
Partial Pass |
At the east and north side of the development and at the rear of the 5 empty lots, there should be a horizontal metal slat fence. The owner want's to do this as every home is built,(building as they sell). The engineering won't close out until this fencing is completed. |
| 10/28/2022 |
ENGR Engineering Final
|
|
Re-inspection required |
|