Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 09/24/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by RSALDAT1 - Approved. Shaun with LLoyd. Schedule structural inspection For perimeter fencing and retaining wall as shown on building plans. Schedule your engineering inspections for site grading and stormwater piping
|
| 09/01/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by RSALDAT1 - Approved. Shaun with Lloyd at 471-1530. Cypress engineering.
Post site address, install track out protection. It right of way permit is required to close sidewalk.Less than 1 acre. Primavera 17th St. project |