Permit: DP19-0308

Parcel: 116232100


Addresses:

1007 S FREEWAY

Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
04/12/2022 ENGR Grading Final MHERNANDEZ Not Applicable Entered by NGARCIA3 - NA 993 S Freeway
06/16/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 - CONTINUE FOR 993 S FREEWAY
06/03/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 - CONTINUE FOR 949 S FREEWAY
09/02/2020 ENGR Grading Final BBENEDON Not ready for Inspection Entered by JSCHNEI2 - Not ready. Basin is retaining water and mud several days after last rain event. Basin is overgrown. Silt fencing is falling down. Provide notice of termination for SWPPP after correction to basin has been completed and controls have been removed. Provide an engineered plan revision for correction of basin. Provide stabilization of disturbed areas.
09/02/2020 ENGR Grading Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Basin is retaining water and mud several days after last rain event. Basin is overgrown. Silt fencing is falling down. Provide notice of termination for SWPPP after correction to basin has been completed and controls have been removed. Provide an engineered plan revision for correction of basin. Provide stabilization of disturbed areas.
09/02/2020 ENGR Grading Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Basin is retaining water and mud several days after last rain event. Basin is overgrown. Silt fencing is falling down. Provide notice of termination for SWPPP after correction to basin has been completed and controls have been removed. Provide an engineered plan revision for correction of basin. Provide stabilization of disturbed areas.
01/16/2020 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Piping at south entrance. Contractor grading west portion of the site. Stabilization provided on the north half of the site.
01/15/2020 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor is paving and installing riprap.
01/14/2020 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Backfill complete, contractor preparing final grade and installing riprap.
01/10/2020 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - 24 inch HDPE installed. Remove the rocks under the pipe at the northern end!
01/09/2020 ENGR Grading Final DROBERTS Continued Entered by DMERANZ1 - THE CONTRACTOR HAS PLACED 230 FEET OF 24 INCH CORRUGATED PLASIC PIPE ALONG THE WEST SIDE OF THE SITE AT THE NORTHEAST CORNER UNDER THE PROJECTED NEW PARKING LOT.
09/21/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - Continued. There is no activity at this time. Basin T19BA00046. Requires correction. Not draining properly
10/31/2023 ENGR Grading Final Partial Pass Frame structure for Gem Show ? need to review with Dave Robert’s.
10/31/2023 ENGR Grading Final Partial Pass Frame structure for Gem Show ? need to review with Dave Robert’s.