Inspection Status: Not Ready
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 04/12/2022 |
ENGR Grading Final |
MHERNANDEZ |
Not Applicable |
Entered by NGARCIA3 - NA
993 S Freeway |
| 06/16/2021 |
ENGR Grading Final |
MHERNANDEZ |
Continued |
Entered by VLEON1 - CONTINUE FOR 993 S FREEWAY |
| 06/03/2021 |
ENGR Grading Final |
MHERNANDEZ |
Continued |
Entered by VLEON1 - CONTINUE FOR 949 S FREEWAY |
| 09/02/2020 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by JSCHNEI2 - Not ready. Basin is retaining water and mud several days after last rain event. Basin is overgrown. Silt fencing is falling down. Provide notice of termination for SWPPP after correction to basin has been completed and controls have been removed. Provide an engineered plan revision for correction of basin. Provide stabilization of disturbed areas.
|
| 09/02/2020 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready. Basin is retaining water and mud several days after last rain event. Basin is overgrown. Silt fencing is falling down. Provide notice of termination for SWPPP after correction to basin has been completed and controls have been removed. Provide an engineered plan revision for correction of basin. Provide stabilization of disturbed areas. |
| 09/02/2020 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready. Basin is retaining water and mud several days after last rain event. Basin is overgrown. Silt fencing is falling down. Provide notice of termination for SWPPP after correction to basin has been completed and controls have been removed. Provide an engineered plan revision for correction of basin. Provide stabilization of disturbed areas. |
| 01/16/2020 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Piping at south entrance. Contractor grading west portion of the site. Stabilization provided on the north half of the site. |
| 01/15/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Contractor is paving and installing riprap.
|
| 01/14/2020 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Backfill complete, contractor preparing final grade and installing riprap. |
| 01/10/2020 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - 24 inch HDPE installed. Remove the rocks under the pipe at the northern end! |
| 01/09/2020 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DMERANZ1 - THE CONTRACTOR HAS PLACED 230 FEET OF 24 INCH CORRUGATED PLASIC PIPE ALONG THE WEST SIDE OF THE SITE AT THE NORTHEAST CORNER UNDER THE PROJECTED NEW PARKING LOT. |
| 09/21/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by JSCHNEI2 - Continued. There is no activity at this time. Basin T19BA00046. Requires correction. Not draining properly
|
| 10/31/2023 |
ENGR Grading Final |
|
Partial Pass |
Frame structure for Gem Show ? need to review with Dave Robert’s. |
| 10/31/2023 |
ENGR Grading Final |
|
Partial Pass |
Frame structure for Gem Show ? need to review with Dave Robert’s. |