Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 09/02/2020 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by JSCHNEI2 - Not ready. Basin is retaining water and mud several days after last rain event. Basin is overgrown. Silt fencing is falling down. Provide notice of termination for SWPPP after correction to basin has been completed and controls have been removed. Provide an engineered plan revision for correction of basin. Provide stabilization of disturbed areas.
|
| 09/02/2020 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready. Basin is retaining water and mud several days after last rain event. Basin is overgrown. Silt fencing is falling down. Provide notice of termination for SWPPP after correction to basin has been completed and controls have been removed. Provide an engineered plan revision for correction of basin. Provide stabilization of disturbed areas. |
| 09/02/2020 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready. Basin is retaining water and mud several days after last rain event. Basin is overgrown. Silt fencing is falling down. Provide notice of termination for SWPPP after correction to basin has been completed and controls have been removed. Provide an engineered plan revision for correction of basin. Provide stabilization of disturbed areas. |
| 01/21/2020 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Correct recent erosion. The ground is fairly muddy in certain places, more stabilization may be required.
Note, the basin has water in it. But it has not been 12 hours since the last rain. Please determine whether or not the basin requires corrections.
Please recall for final inspections.
|
| 09/02/2020 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by JSCHNEI2 - Not ready. Basin is retaining water and mud several days after last rain event. Basin is overgrown. Silt fencing is falling down. Provide notice of termination for SWPPP after correction to basin has been completed and controls have been removed. Provide an engineered plan revision for correction of basin. Provide stabilization of disturbed areas.
|
| 09/02/2020 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready. Basin is retaining water and mud several days after last rain event. Basin is overgrown. Silt fencing is falling down. Provide notice of termination for SWPPP after correction to basin has been completed and controls have been removed. Provide an engineered plan revision for correction of basin. Provide stabilization of disturbed areas. |
| 09/02/2020 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready. Basin is retaining water and mud several days after last rain event. Basin is overgrown. Silt fencing is falling down. Provide notice of termination for SWPPP after correction to basin has been completed and controls have been removed. Provide an engineered plan revision for correction of basin. Provide stabilization of disturbed areas. |
| 01/24/2020 |
ENGR Engineering Final
|
BBENEDON |
Denied |
Entered by DMERANZ1 - Basin is still retaining water throughout its entire length and it has been more than 48 hours since the last rain event.
|
| 01/23/2020 |
ENGR Engineering Final
|
BBENEDON |
Denied |
Entered by DMERANZ1 - The basin is retaining water more than 24 hours after the last rain event. Provide an engineered correction to prevent standing water |
| 01/21/2020 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Correct recent erosion. The ground is fairly muddy in certain places, more stabilization may be required.
Note, the basin has water in it. But it has not been 12 hours since the last rain. Please determine whether or not the basin requires corrections.
Please recall for final inspections.
|