Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP19-0300
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/28/2022 | ENGR Grading Final | BBENEDON | Approved | Entered by NGARCIA3 - Approved |
04/28/2022 | ENGR Grading Final | BBENEDON | Approved | Entered by NGARCIA3 - Approved |
04/04/2022 | ENGR Grading Final | DROBERTS | Continued | Entered by VVERA1 - IS CONTINUED AT THIS TIME, CREWS ARE WORKING ON THE LANDSCAPING ITEMS AND INSTALLING ANTS AS NEEDED AND PREPARING TO POUR THE CONCRETE STORM DRAINS. |
03/14/2022 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by RSALDAT1 - PARTIAL AT THIS TIME, WALKED THE SITE WITH THE CONTRACTOR TO SEE WHAT CONCERNS BRIAN BENEDON HAS RAISED. THE ROOF DRAINAGE FOR THE SITE IS BEING DIRECTED MOSTLY TO THE STREET AND IS NOT MEETING THE STORMWATER PLANS THAT HAVE BEEN APPROVED. I HAVE ADVISED THE SUPERVISOR. HUCK WITH APN THAT WE WILL NEED TO SEE AN APPROVED REVISED DRAWING FOR ALL THE CHANGES BEFORE WE WILL LET THEM IMPLEMENT THEM IN THE FIELD. ALSO THERE ARE SOME OTHER CHANGES THAT MAY NEED TO BE MADE TO SIDEWALKS AN CURBS ON THIS SITE BEFORE THE FINAL CAN BE ACCEPTED. WE WILL WALK THIS SITE NEXT WEEK AND DISCUSS ALL THE CHANGES AT THAT TIME. |
03/08/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - Continued. Contractor grading for landscaped areas |
02/03/2022 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Perimeter wall, front. |
01/25/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Final grading in progress |
01/19/2022 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Courtesy unscheduled inspection. Ron’s concrete installing sidewalks. |
01/13/2022 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by VVERA1 - Partially approved. Curb installation in progress |
12/01/2021 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by NGARCIA3 - Par. Catch basin inlet |
11/24/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Grading |
11/02/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Grading and Light pole footings installed |
10/26/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - Continued. Rough grading |
09/07/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Contractor erecting building number three |
06/28/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CREWS ARE WORKING ON THE BUILDING FOOTINGS, UTILITIES, AND FORMING AT THIS TIME. |
04/29/2022 | ENGR Grading Final | BBENEDON | Approved | Entered by VVERA1 - 9190.Approved. Please change permit status to final. |
03/21/2022 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN/FORMING THE APRON FOR THE TRASH BIN FLOOR. |
11/05/2021 | ENGR Grading Final | BBENEDON | Approved | Entered by RSALDAT1 - . Approved |
10/19/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Trash enclosure slabs have been poured within enclosure. Apron has not been installed |
10/11/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by NGARCIA3 - CN / SETTING THE REBAR FOR THE FLOOR FOR TRASH BIN THREE OF THEM. |
09/22/2021 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by VVERA1 - 09181, Partially approved. Trash enclosure pre-grout, three buildings. Photograph documentation from superintendent Chuck via text |
09/21/2021 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by NGARCIA3 - Partially approved. Pre-grout. Chuck |
09/15/2021 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by NGARCIA3 - Partially approved. 3 Trash enclosure footings. Chuck |
09/14/2021 | ENGR Grading Final | BBENEDON | Not ready for Inspection | Entered by VVERA1 - 09181. Not ready. Chuck at 400 2709. Provide number four rebar at 32 inches on center vertical. Schedule inspections from development package permit |
04/29/2022 | ENGR Grading Final | BBENEDON | Approved | Entered by VVERA1 - Approved. Please change permit status to final. |
04/23/2020 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - THIS PLAN HAS BEEN APPROVED AND IS CURRENTLY ON THE APPROVED SHELF WAITING TO BE ISSUED |