Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP19-0300
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/29/2022 | ENGR Engineering Final | BBENEDON | Approved | Entered by VVERA1 - Approved. Please change permit status to final. |
04/27/2022 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by VVERA1 - Partially approved |
04/26/2022 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by NGARCIA3 - Partially approved. Chuck with WAPN builders |
04/29/2022 | ENGR Engineering Final | BBENEDON | Approved | Entered by VVERA1 - Approved. Please change permit status to final. |
04/28/2022 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by NGARCIA3 - Partially approved. Provide notice of termination for SWPPP |
03/08/2022 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VVERA1 - Not ready. Contractor informed that sidewalk scuppers are necessary or needed and that he should contact the project engineer for further instruction |