Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
SITE - Stormwater Setup and Controls |
|
Not Ready |
|
| 03/16/2020 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Partial Approval |
Entered by SFLORES2 - Track out protections |
| 03/16/2020 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Partial Approval |
Entered by SFLORES2 - Track out protections |
| 02/20/2020 |
SITE - Stormwater Setup and Controls |
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - Met with GC on site he said that his first inspection was scheduled for 16 March. |
| 02/08/2024 |
SITE - Stormwater Setup and Controls |
|
Passed |
|
| 05/04/2023 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
no concerns at this time this is the first time I’ve been out here in about a year contractors getting ready to install some CMP . Who won the contractor that you need to call for inspection for the CMP |
| 05/25/2023 |
SITE - Stormwater Setup and Controls |
|
Partial Pass |
No concerns at this time |