Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP19-0294
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | SITE - Stormwater Follow-up | Not Ready | ||
02/08/2024 | SITE - Stormwater Follow-up | Passed | ||
05/10/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Contractor is tapped into a 60 inch CMP pipe that is existing a 16 inch pipe and a 24 inch pipe is tapping into the 60 | |
05/25/2023 | SITE - Stormwater Follow-up | Partial Pass | Everything looks good this morning cutting the Road to the plant. | |
06/09/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time for stormwater | |
08/25/2023 | SITE - Stormwater Follow-up | Not Ready | No address located. | |
08/28/2023 | SITE - Stormwater Follow-up | Complete (Recurring) | Met with PCL and looked over the work that remains, Pavement placement is the largest amount of work that remains at this time. Weather Permitting they expect to be done in about 3 weeks except some general cleanup of the site. No concerns at this time |