Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
PDSD Site/Engineering Division - Landscaping |
|
Not Ready |
|
| 10/27/2022 |
PDSD Site/Engineering Division - Landscaping |
|
Not Ready |
|
| 02/08/2024 |
PDSD Site/Engineering Division - Landscaping |
|
Not Ready |
It was noted during todays Inspection that the disturbed areas in and around this site have not been hydro seeded or had D.G. placed over the disturbed areas. This Inspection will remain open along with the Engineering Grading till all areas have been covered per the Technical Standards |
| 03/18/2024 |
PDSD Site/Engineering Division - Landscaping |
|
Passed |
|
| 12/19/2023 |
PDSD Site/Engineering Division - Landscaping |
|
Passed |
|
| 12/19/2023 |
PDSD Site/Engineering Division - Landscaping |
|
Passed |
|