Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP19-0291
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
05/14/2020 | ENGR Grading Final | RLEDONNE | Approved | Entered by RSALDAT1 - |
05/11/2020 | ENGR Grading Final | DROBERTS | Not ready for Inspection | Entered by RSALDAT1 - NOT READY AT THIS TIME DUE TO THE FACT THAT THERE IS NO DETAILS PROVIDED IN THE APPROVED PLANS FOR THIS WORK. I HAVE REQUIRED THE ARCHITECTURE TO GIVE HIS RECOMMENDATIONS FOR REBAR TYPE, SIZE,AND SPACING FOR THE FLOOR SLAB OF THIS TRASH PAD AND PROVIDE THIS INFORMATION ON A STAMPED SEALED DOCUMENT. A FINAL APPROVED REVISED PLAN SHEET/DETAIL WILL ALSO BE REQUIRED PRIOR TO THE FINAL APPROVAL FOR THIS SITE. |
03/25/2020 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by SFLORES2 - Met with contractor on site called in for site wall inspection needs to have permit and approve plans for site wall building inspector to inspect per Armando. |
08/26/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Project ongoing |
11/24/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by PAHUMAD1 - Continue. Working on southside of site south existing building. |
10/29/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Met with super went over inspections to call in. To have storm water inspection book and NOI on site at all times. |
10/27/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by PAHUMAD1 - Continue. Grading has started on south side of existing Metal building. |
07/27/2020 | ENGR Grading Final | RLEDONNE | Continued | Entered by RSALDAT1 - Continue. Talked with GC on phone went over plans on tablet. Still working on development package. |
10/25/2023 | ENGR Grading Final | Not Ready | ||
12/18/2023 | ENGR Grading Final | Passed |