Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP19-0291
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
10/27/2022 | ENGR Engineering Final | Not Ready | ||
09/30/2021 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by VVERA1 - Partially approved. First maintenance building OK |
10/14/2021 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by RSALDAT1 - S NOT READY AT THIS TIME. THE CONTRACTOR IS LOOKING FOR A TCO FOR OCCUPANCY FOR A COMBO PERMIT WITHIN THIS SITE. ADDITIONAL SITE WILL BE REQUIRED PRIOR TO CLOSING THIS PERMIT. THEY WILL CONTACT CLAYTON TREVILLYAN ABOUT OBTAINING A FULL APPROVAL ON THEIR BUILDING PERMIT. |
08/12/2021 | ENGR Engineering Final | MHERNANDEZ | Continued | Entered by VVERA1 - 9190 (GRADING - FINAL) CN / WALK THE SITE FOR FUTURE BUILDING .THEY FINSH ONE BUILDING AND ARE GOING TO CONSTRUCT A NEW BUILDING. AND LEAVING THE PERMIT OPEN FOR THE NEW BUILDING. |
10/24/2023 | ENGR Engineering Final | Not Ready | ||
12/18/2023 | ENGR Engineering Final | Passed | ||
12/18/2023 | ENGR Engineering Final | Passed |