Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 08/26/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. No inspection history. 17 inspections for seven franks office complex. |
| 04/27/2023 | ENGR Grading Final | Not Ready | Trash enclosure installed without inspection. Below ground and parking lot stormwater piping installed without inspection. Provide Documentation of proof that work was installed in compliance with approved plans. complete remaining work as shown on approved plans including basin and water harvesting areas. Riprap, bollards, bicycle, parking, etc. Complete landscaping as shown and approved plans. J with Barker |
|
| 04/27/2023 | ENGR Grading Final | Not Ready | Trash enclosure installed without inspection. Below ground and parking lot stormwater piping installed without inspection. Provide Documentation of proof that work was installed in compliance with approved plans. complete remaining work as shown on approved plans including basin and water harvesting areas. Riprap, bollards, bicycle, parking, etc. Complete landscaping as shown and approved plans. Also Accessible route as shown between buildings. J with Barker |
|
| 04/27/2023 | ENGR Grading Final | Not Ready | Trash enclosure installed without inspection. Below ground and parking lot stormwater piping installed without inspection. Provide Documentation of proof that work was installed in compliance with approved plans. complete remaining work as shown on approved plans including basin and water harvesting areas. Riprap, bollards, bicycle, parking, etc. Complete landscaping as shown and approved plans. Also Accessible route as shown between buildings. J with Barker |
|
| 06/27/2023 | ENGR Grading Final | Not Ready | No change since last inspection | |
| 07/25/2023 | ENGR Grading Final | Not Ready | pedestrian pathways to and from building to the trash enclosure and building 2552 are non compliant for cross and running slopes at various locations. | |
| 07/25/2023 | ENGR Grading Final | Not Ready | pedestrian pathways to and from building to the trash enclosure and building 2552 are non compliant for cross and running slopes at various locations. | |
| 07/25/2023 | ENGR Grading Final | Not Ready | pedestrian pathways to and from building to the trash enclosure and building 2552 are non compliant for cross and running slopes at various locations. |