Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP19-0235
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
10/27/2022 | ENGR Engineering Final | Not Ready | ||
05/26/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - NOT READY FOR 1000 E GRANT RD NO CHANGE SINCE LAST INSPECTION |
01/08/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - NR FOR 1140 E GRANT RD |
01/08/2021 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by VLEON1 - Partially approved. Landscaping has not been completed. The trees have not been properly staked as specified on plan. Please complete all work shown on civil drawings Or provide revisions. Remove any dirt left in the streets, along curb during construction. Per conversation with Dave Roberts, Laura 869-9420, with Wheat design group needs to submit a plan revision for changes made from the approved drawings. Note; work shown on the plan located within the ROW has not been completed at the Santa Rita crossing also along Fremont. |
01/08/2021 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - 1060 E GRANT RD - Partially approved. Landscaping has not been completed. The trees have not been properly staked as specified on plan. Please complete all work shown on civil drawings Or provide revisions. Remove any dirt left in the streets, along curb during construction. Per conversation with Dave Roberts, Laura 869-9420, with Wheat design group needs to submit a plan revision for changes made from the approved drawings. Note; work shown on the plan located within the ROW has not been completed at the Santa Rita crossing also along Fremont. |
01/08/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready. |
01/08/2021 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Landscaping has not been completed. The trees have not been properly staked as specified on plan. Please complete all work shown on civil drawings Or provide revisions. Remove any dirt left in the streets, along curb during construction. Per conversation with Dave Roberts, Laura 869-9420, with Wheat design group needs to submit a plan revision for changes made from the approved drawings. Note; work shown on the plan located within the ROW has not been completed at the Santa Rita crossing also along Fremont. |
01/08/2021 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Landscaping has not been completed. The trees have not been properly staked as specified on plan. Please complete all work shown on civil drawings Or provide revisions. Remove any dirt left in the streets, along curb during construction. Per conversation with Dave Roberts, Laura 869-9420, with Wheat design group needs to submit a plan revision for changes made from the approved drawings. Note; work shown on the plan located within the ROW has not been completed at the Santa Rita crossing also along Fremont. |
01/08/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - FOR 1150 E GRANT RD - Not ready. Landscaping has not been completed. Please complete all work shown on civil drawings and request inspection for all required inspections as noted on permit card. Per conversation with Dave Roberts, Laura 869-9420, with Wheat design group needs to submit a plan revision for changes made from the approved drawings. Note; work shown on the plan located within the ROW has not been completed at the Santa Rita crossing also along Fremont. |
01/08/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - FOR 2327 N SANTA RITA AVE - Not ready. Landscaping has not been completed. Please complete all work shown on civil drawings and request inspection for all required inspections as noted on permit card. Per conversation with Dave Roberts, Laura 869-9420, with Wheat design group needs to submit a plan revision for changes made from the approved drawings. Note; work shown on the plan located within the ROW has not been completed at the Santa Rita crossing also along Fremont. |
01/08/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - Not ready. Landscaping has not been completed. Please complete all work shown on civil drawings and request inspection for all required inspections as noted on permit card. Per conversation with Dave Roberts, Laura 869-9420, with Wheat design group needs to submit a plan revision for changes made from the approved drawings. Note; work shown on the plan located within the ROW has not been completed at the Santa Rita crossing also along Fremont. |
01/08/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - FOR 1000 E GRANT RD - Not ready. Landscaping has not been completed. Please complete all work shown on civil drawings and request inspection for all required inspections as noted on permit card. Per conversation with Dave Roberts, Laura 869-9420, with Wheat design group needs to submit a plan revision for changes made from the approved drawings. Note; work shown on the plan located within the ROW has not been completed at the Santa Rita crossing also along Fremont. |
12/24/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready. Landscaping has not been completed. Please complete all work shown on civil drawings and request inspection for all required inspections as noted on permit card. Note; work shown on the plan located within the ROW has not been completed at the Santa Rita crossing also along Fremont. |
12/24/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready. Landscaping has not been completed. Please complete all work shown on civil drawings and request inspection for all required inspections as noted on permit card. Note; work shown on the plan located within the ROW has not been completed at the Santa Rita crossing also along Fremont. |
12/24/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready. Landscaping has not been completed. Please complete all work shown on civil drawings and request inspection for all required inspections as noted on permit card. Note; work shown on the plan located within the ROW has not been completed at the Santa Rita crossing also along Fremont. |
12/24/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready |
12/24/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready |
12/18/2020 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - partially approved. Note, this was an unscheduled inspection. Grading discrepancies and trip hazard are located within public right of way at Fremont and Santa Rita street connections. |
12/18/2020 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - partially approved. Note, this was an unscheduled inspection. Grading discrepancies and trip hazard are located within public right of way at Fremont and Santa Rita street connections. |
05/12/2020 | ENGR Engineering Final | ACONNOR | Not ready for Inspection | Entered by ACONNOR1 - |
05/26/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - NOT READY NO CHANGE SINCE LAST INSPECTION |
01/08/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - NR FOR 1140 E GRANT RD |
01/08/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - |
01/08/2021 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by VLEON1 - Partially approved. Landscaping has not been completed. The trees have not been properly staked as specified on plan. Please complete all work shown on civil drawings Or provide revisions. Remove any dirt left in the streets, along curb during construction. Per conversation with Dave Roberts, Laura 869-9420, with Wheat design group needs to submit a plan revision for changes made from the approved drawings. Note; work shown on the plan located within the ROW has not been completed at the Santa Rita crossing also along Fremont. |
01/08/2021 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - 1060 E GRANT RD Partially approved. Landscaping has not been completed. The trees have not been properly staked as specified on plan. Please complete all work shown on civil drawings Or provide revisions. Remove any dirt left in the streets, along curb during construction. Per conversation with Dave Roberts, Laura 869-9420, with Wheat design group needs to submit a plan revision for changes made from the approved drawings. Note; work shown on the plan located within the ROW has not been completed at the Santa Rita crossing also along Fremont. |
01/08/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready. |
01/08/2021 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by RSALDAT1 - 1090 E GRANT RD. - Partially approved. Landscaping has not been completed. The trees have not been properly staked as specified on plan. Please complete all work shown on civil drawings Or provide revisions. Remove any dirt left in the streets, along curb during construction. Per conversation with Dave Roberts, Laura 869-9420, with Wheat design group needs to submit a plan revision for changes made from the approved drawings. Note; work shown on the plan located within the ROW has not been completed at the Santa Rita crossing also along Fremont. |
01/08/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - FOR 1150 E GRANT RD - Not ready. Landscaping has not been completed. Please complete all work shown on civil drawings and request inspection for all required inspections as noted on permit card. Per conversation with Dave Roberts, Laura 869-9420, with Wheat design group needs to submit a plan revision for changes made from the approved drawings. Note; work shown on the plan located within the ROW has not been completed at the Santa Rita crossing also along Fremont. |
01/08/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - FOR 2327 N SANTA RITA AVE - Not ready. Landscaping has not been completed. Please complete all work shown on civil drawings and request inspection for all required inspections as noted on permit card. Per conversation with Dave Roberts, Laura 869-9420, with Wheat design group needs to submit a plan revision for changes made from the approved drawings. Note; work shown on the plan located within the ROW has not been completed at the Santa Rita crossing also along Fremont. |
01/08/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - Not ready. Landscaping has not been completed. Please complete all work shown on civil drawings and request inspection for all required inspections as noted on permit card. Per conversation with Dave Roberts, Laura 869-9420, with Wheat design group needs to submit a plan revision for changes made from the approved drawings. Note; work shown on the plan located within the ROW has not been completed at the Santa Rita crossing also along Fremont. |
01/08/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - FOR 1000 E GRANT RD - Not ready. Landscaping has not been completed. Please complete all work shown on civil drawings and request inspection for all required inspections as noted on permit card. Per conversation with Dave Roberts, Laura 869-9420, with Wheat design group needs to submit a plan revision for changes made from the approved drawings. Note; work shown on the plan located within the ROW has not been completed at the Santa Rita crossing also along Fremont. |
09/01/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by JSCHNEI2 - Not ready. |
09/01/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by JSCHNEI2 - Not ready. |
09/01/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by JSCHNEI2 - Not ready. |
09/01/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by JSCHNEI2 - Not ready. Project is ongoing. |
09/01/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by JSCHNEI2 - Not ready. Project is ongoing. |
09/01/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by JSCHNEI2 - Not ready. Project is ongoing. |
09/01/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by JSCHNEI2 - Not ready. Project is ongoing. |
09/01/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by JSCHNEI2 - Not ready. Project is ongoing. |
09/01/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by JSCHNEI2 - Not ready. Project is ongoing. |
09/01/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by JSCHNEI2 - Not ready. Project is ongoing. |
09/01/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by JSCHNEI2 - Not ready. Project is ongoing. |