Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/23/2021 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by VLEON1 - |
| 04/23/2021 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by VLEON1 - |
| 04/22/2021 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by VLEON1 - |
| 04/21/2021 |
ENGR Engineering Final
|
BBENEDON |
Continued |
Entered by VLEON1 - Partially approved. Roy with Canyon. Complete rain water connections and I’ll work associated with project and reschedule for final approval.
|
| 04/20/2021 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by VLEON1 - |
| 03/26/2021 |
ENGR Engineering Final
|
DROBERTS |
Continued |
Entered by VLEON1 - CONTINUED AT THIS TIME, BUT NOT FOR A CERTIFICATE OF OCCUPANCY. THE FOLLOWING THINGS WILL NEED TO BE ADDRESSED PRIOR TO REQUESTING AN ENGINEERING FINAL FOR THIS PERMIT. COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS, BOTH COMBO AND DEVELOPMENT PACKAGE. ENSURE ALL OTHER DEPARTMENTS ARE OK FOR THE FINAL CLOSURE OF THE PERMIT, THIS WILL INCLUDE BUT IS NOT LIMITED TO BUILDING, FIRE, WATER, TRANSPORTATION. PROVIDE ALL CLOSEOUT DOCUMENTATION FOR ALL PERMITS, THIS WILL INCLUDE APPROVED REVISED DRAWINGS FOR ALL PERMITS, CERTIFICATION LETTERS FOR THE DEVELOPMENT PACKAGE FROM THE ENGINEER OF RECORD, AND THE NOTIFICATION OF TERMINATION LETTER FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY FOR THE SWPPP. |