Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP19-0214
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | PDSD Engineering Division Pre-Construction SITE | Not Ready | ||
10/11/2023 | PDSD Engineering Division Pre-Construction SITE | Not Ready | Called Rick engineering # (520) 795-1000 spoke to Vanessa she said she would get me in touch with Janak he called me back (586) 601-4102 this permit was pulled by Borderland construction. it was a general address for the Martin Luther King boulevard extension plat A sections 1 2 and 3, I will review with Dave Roberts. | |
10/18/2023 | PDSD Engineering Division Pre-Construction SITE | Passed |